Iowa Department of Agriculture & Land Stewardship - Wright Co. 2026 Batch and Build EOF Project - EOF 2026-03
Iowa Board of Corrections | State of IowaState · Des Moines, IA- Due
- Oct 6, 2026
- Deadline passed
- Posted
- Sep 10, 2026
- Primary contact
- Emalyn Polz
- (515) 332-9073
Know who Iowa Board of Corrections | State of Iowa buys from before you write a word.
Every vendor contract, renewal date and decision maker at this agency, in one place.
Set up in 30 seconds · No credit card
THE 30-SECOND BRIEF
Construction contractor sought by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality for the Wright Co. 2026 Batch and Build Edge-of-Field Project located in Wright County, IA (EOF 2026-03). The project includes installing 4 bioreactors, 7 saturated buffer structures, and 11 Edge-of-Field Practices involving excavation, earthwork, grading, mobilization, seeding, water control structures (WCS), woodchips, geotextile fabric, perforated and non-perforated plastic piping, tile investigation, and corrugated metal pipe (CMP). The estimated cost range is $165,000 to $185,000. Submission deadline is October 6, 2026, at 3:00 PM local time via IMPACS portal, with a pre-bid conference on September 22, 2026. A 10% bid bond and 100% performance/payment bond are required, along with registration with the Iowa Division of Labor.
Seeding; Mobilization and Demobilization; Tile Investigation; Water Control Structures (WCS); Wood Chips; Excavation; Earthfill; Fiberglass Marker Flag; Class II Nonwoven Geotextile Fabric; Black Plastic; 6" Cap; 6"x 6" Y; 6" x 6" x 6" T; 6"x 6" x 8" T; 8"x 8"x 6" T; 10"x 10"x 6" T; 12"x 12"x 6" T; 10"x 10"x 6"x 6" Cross; 8"x 8"x 6"x 6" Cross; 6" Dia. Perforated Tile CPT; 6" Dia. Non-Perforated Tile CPT; 8" Dia. Non-Perforated Tile CPT; 10" Dia. Non-Perforated Tile CPT; 12" Dia. Non-Perforated Tile CPT; 6" CMP w/ Animal Guard; 8" CMP w/ Animal Guard; 10" CMP w/ Animal Guard; 12" CMP w/ Animal Guard; Field Connection; Remove, Salvage, And Re-Install Existing Water Control Structure (WCS)
SUMMARY
Construction contractor sought by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality for the Wright Co. 2026 Batch and Build Edge-of-Field Project located in Wright County, IA (EOF 2026-03).
The project includes installing 4 bioreactors, 7 saturated buffer structures, and 11 Edge-of-Field Practices involving excavation, earthwork, grading, mobilization, seeding, water control structures (WCS), woodchips, geotextile fabric, perforated and non-perforated plastic piping, tile investigation, and corrugated metal pipe (CMP). The estimated cost range is $165,000 to $185,000. Submission deadline is October 6, 2026, at 3:00 PM local time via IMPACS portal, with a pre-bid conference on September 22, 2026. A 10% bid bond and 100% performance/payment bond are required, along with registration with the Iowa Division of Labor.
REQUIRED DELIVERABLES
20- Seeding
- Mobilization and Demobilization
- Tile Investigation
- Water Control Structures (WCS)
- Wood Chips
- Excavation
- Earthfill
- Fiberglass Marker Flag
- Class II Nonwoven Geotextile Fabric
- Black Plastic
- 6" Cap
- 6"x 6" Y
- 6" x 6" x 6" T
- 6"x 6" x 8" T
- 8"x 8"x 6" T
- 10"x 10"x 6" T
- 12"x 12"x 6" T
- 10"x 10"x 6"x 6" Cross
- 8"x 8"x 6"x 6" Cross
- 6" Dia
Perforated Tile CPT; 6" Dia. Non-Perforated Tile CPT; 8" Dia. Non-Perforated Tile CPT; 10" Dia. Non-Perforated Tile CPT; 12" Dia. Non-Perforated Tile CPT; 6" CMP w/ Animal Guard; 8" CMP w/ Animal Guard; 10" CMP w/ Animal Guard; 12" CMP w/ Animal Guard; Field Connection; Remove, Salvage, And Re-Install Existing Water Control Structure (WCS)
REQUIRED ATTACHMENTS
6- Doc EE - Bid Security
- Doc CC - Proposal
- Acknowledgment
- Affidavit
- Performance/Payment Bond
- Power of Attorney
- Submit to
- https://app01.jaggaer.com/apps/Router/ViewSourcingEvent?AuthToken=1%3AAES2%23CImNGRA5aPReD7o94ZOioZ75z3OD0SAaMVjyH4hp7rI
- Scope location
- Wright County, IA
- Reported agency
- Iowa Department of Agriculture & Land Stewardship
Questions about this RFP
How do I respond to this Bid from Iowa Board of Corrections | State of Iowa?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 6, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://app01.jaggaer.com/apps/Router/ViewSourcingEvent?AuthToken=1%3AAES2%23CImNGRA5aPReD7o94ZOioZ75z3OD0SAaMVjyH4hp7rI. For questions, contact Emalyn Polz.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Iowa Board of Corrections | State of Iowa in IA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Emalyn Polz at (515) 332-9073. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Seeding; Mobilization and Demobilization; Tile Investigation; Water Control Structures (WCS); Wood Chips; Excavation; Earthfill; Fiberglass Marker Flag; Class II Nonwoven Geotextile Fabric; Black Plastic; 6" Cap; 6"x 6" Y; 6" x 6" x 6" T; 6"x 6" x 8" T; 8"x 8"x 6" T; 10"x 10"x 6" T; 12"x 12"x 6" T;. Proposals should clearly address how each deliverable will be met.
Can I search Bids like this in ChatGPT or Claude?
Yes. Civic IQ has an MCP server that connects ChatGPT, Claude and other AI assistants to live Civic IQ data: open RFPs, pre-RFP signals from public meetings, awarded contracts and agency decision-makers across 100,000+ US public agencies. Add https://beta.mcp.civiciq.com/mcp as a connector (in ChatGPT under Settings > Apps & Connectors, in Claude under Settings > Connectors) and sign in with a free Civic IQ account at civiciq.com/mcp.
Show 3 more questions
Where can I find more RFPs from Iowa Board of Corrections | State of Iowa?
All active and historical solicitations from Iowa Board of Corrections | State of Iowa are tracked and searchable. As a state agency, Iowa Board of Corrections | State of Iowa regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Doc EE - Bid Security, Doc CC - Proposal, Acknowledgment, and Affidavit, Performance/Payment Bond, Power of Attorney. Review the full document from Iowa Board of Corrections | State of Iowa for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Wright County, IA. Review the full solicitation for detailed scope requirements.