Gunnison Valley Transportation Authority Enhanced Bus Stop Facility Design/Bid RFQ # 2026-01
- Due
- Feb 6, 2026
- Deadline passed
- Posted
- Jan 2, 2026
- Primary contact
- Scott Truex
- (970) 275-0111
The 30-second brief
Gunnison Valley Transportation Authority (GVTA) is seeking a qualified architectural and engineering (A&E) firm to provide architectural and engineering services, project management, and construction contract administration services for the design and construction of a proposed new Enhanced Bus Stop Facility with offices, public restrooms, and a passenger waiting area. The facility is expected to be approximately 1,200 square feet (stick-frame or pre-fab, 1 or 2 stories) with in-floor heat, sprinklers, utilities, 20,000 square feet of paved apron and parking, and site landscaping, located at 301 W. Tomichi Avenue in Gunnison, Colorado. The project is funded in part by a $1,000,000 grant from the Colorado Department of Transportation (CDOT). Proposals are due by 5:00 PM MDT on Friday, February 6, 2026, submitted electronically in native PDF format via email to Scott Truex. Inquiries are due by January 12, 2026. Evaluation criteria comprise Technical Proposal Components (40%), Key Personnel/Capacity (30%), and Past Performance (30%), with qualification-based selection in accordance with the Brooks Act.
Technical Proposal Components: 40%, Key Personnel/Capacity: 30%, Past Performance: 30%
Hear what Gunnison Valley Transportation Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Gunnison Valley Transportation Authority (GVTA) is seeking a qualified architectural and engineering (A&E) firm to provide architectural and engineering services, project management, and construction contract administration services for the design and construction of a proposed new Enhanced Bus Stop Facility with offices, public restrooms, and a passenger waiting area.
The facility is expected to be approximately 1,200 square feet (stick-frame or pre-fab, 1 or 2 stories) with in-floor heat, sprinklers, utilities, 20,000 square feet of paved apron and parking, and site landscaping, located at 301 W. Tomichi Avenue in Gunnison, Colorado. The project is funded in part by a $1,000,000 grant from the Colorado Department of Transportation (CDOT). Proposals are due by 5:00 PM MDT on Friday, February 6, 2026, submitted electronically in native PDF format via email to Scott Truex. Inquiries are due by January 12, 2026. Evaluation criteria comprise Technical Proposal Components (40%), Key Personnel/Capacity (30%), and Past Performance (30%), with qualification-based selection in accordance with the Brooks Act.
EVALUATION CRITERIA
3- Technical Proposal Components: 40%
- Key Personnel/Capacity: 30%
- Past Performance: 30%
REQUIRED ATTACHMENTS
5- ATTACHMENT A – Proposer Checklist
- ATTACHMENT B – Proposal Affidavit
- ATTACHMENT C – Acknowledgement of Addenda
- ATTACHMENT D – Affidavit of Non-Collusion
- ATTACHMENT E – Title VI Assurance
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Gunnison, CO
- Projected sq ft
- 1,200 sq ft
Questions about this RFQ
How do I respond to this RFQ from Gunnison Valley Transportation Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is February 6, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Scott Truex.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Gunnison Valley Transportation Authority in CO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Scott Truex at (970) 275-0111. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Technical Proposal Components: 40%, Key Personnel/Capacity: 30%, Past Performance: 30%" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Gunnison Valley Transportation Authority?
All active and historical solicitations from Gunnison Valley Transportation Authority are tracked and searchable. As a special district agency, Gunnison Valley Transportation Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: ATTACHMENT A – Proposer Checklist, ATTACHMENT B – Proposal Affidavit, ATTACHMENT C – Acknowledgement of Addenda, ATTACHMENT D – Affidavit of Non-Collusion, ATTACHMENT E – Title VI Assurance. Review the full document from Gunnison Valley Transportation Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Gunnison, CO. The total projected area is 1200 sq ft. Review the full solicitation for detailed scope requirements.