RFQOPEN

Fort Pierce Utilities Authority - Electric Continuing Design-Build Services - 2026

Fort Pierce Utilities Authority, Fort Pierce, FL·Utility District

19 days until submission deadline — October 16, 2026

Track Fort Pierce Utilities Authority solicitations

Get alerted when Fort Pierce Utilities Authority posts a new RFP, and see the pre-RFP signals months before it publishes.

Get started free

Create a free account · no credit card

Oct 16, 2026
Submission Deadline
Scope Location
St. Lucie, FL
Submission Address
206 S 6th St, Fort Pierce, FL, 34950

SUMMARY

Fort Pierce Utilities Authority seeks qualified design-build firms to establish a continuing contract pool for electric utility system and related infrastructure projects in St. Lucie, FL. The scope encompasses professional design services and construction services under a single point of responsibility, including new construction, rehabilitation, renewal and replacement, repairs, upgrades, emergency work, and miscellaneous utility or facility improvements. Individual project construction costs will remain below Florida Statutes Section 287.055 continuing contract limits. Selection is based on demonstrated qualifications, team structure, licensure, bonding capacity, safety history, and integrated delivery ability. Submission deadline is October 16, 2026.

EVALUATION CRITERIA

Demonstrated qualifications, team structure, licensure, bonding capacity, safety history, ability to deliver integrated design and construction services

REQUIRED DELIVERABLES

New construction, Rehabilitation, Renewal and replacement, Repairs, Upgrades, Emergency work, Other miscellaneous utility or facility improvement projects

19
DAYS REMAINING

You're reading this because they made it public. Your competitor read the board minutes that named this project 6–18 months ago. We read those same minutes. Next time, read them first.

Work in government? Get Civic IQ free →

Frequently asked questions

Common questions about this solicitation, answered from the record.

How do I respond to this RFQ from Fort Pierce Utilities Authority?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 16, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 206 S 6th St, Fort Pierce, FL, 34950.

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Demonstrated qualifications, team structure, licensure, bonding capacity, safety history, ability to deliver integrated design and construction services" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Fort Pierce Utilities Authority?

All active and historical solicitations from Fort Pierce Utilities Authority are tracked and searchable. As a utility district agency, Fort Pierce Utilities Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

Is this solicitation still open for submissions?

Based on the posted deadline of October 16, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.

What documents are required to bid on this RFQ?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Fort Pierce Utilities Authority for the complete list.

Can small businesses or minority-owned firms bid on this RFQ?

Most government agencies, including Fort Pierce Utilities Authority in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFQ submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: St. Lucie, FL. Review the full solicitation for detailed scope requirements.

What are the key deliverables?

The solicitation specifies the following deliverables: New construction, Rehabilitation, Renewal and replacement, Repairs, Upgrades, Emergency work, Other miscellaneous utility or facility improvement projects. Proposals should clearly address how each deliverable will be met.

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free