RFQOPEN

City of Palatka - Platt Drew Reclamation Facility Headworks Rehabilitation Project RFQ 2026-04 (2026)

City of Palatka, City of Palatka, FL·City

24 days until submission deadline — October 16, 2026

Track City of Palatka solicitations

Get alerted when City of Palatka posts a new RFP, and see the pre-RFP signals months before it publishes.

Get started free

Create a free account · no credit card

Sep 16, 2026
Posted Date
Oct 16, 2026
Submission Deadline
Primary Contact
Alex Romero · (386) 329-0100
Scope Location
Palatka, FL
Submission Address
City of Palatka City Hall, Attention: Karen Hayes, City Clerk, 201 North 2nd Street, Palatka, Florida 32177

SUMMARY

The City of Palatka, FL, requests Statements of Qualifications from qualified Florida-licensed engineering firms to provide professional engineering, environmental review support, permitting, bidding, construction-phase services, and closeout support for the Platt Drew Reclamation Facility Headworks Rehabilitation Project. The work involves wastewater treatment plant headworks, influent channel rehabilitation, screening and grit removal, and storm hardening or flood resilience at 3010 Browns Landing Road. The project is funded by CDBG-DR under Commerce Agreement No. MS008 and is subject to 24 C.F.R. part 58 environmental review and CCNA requirements. Submittals are due by October 16, 2026, and must be delivered to City Hall.

EVALUATION CRITERIA

Understanding of the Project (12), Relevant wastewater/headworks experience (12), Qualifications of the proposed team (12), Ability to deliver within grant constraints and schedule (12), Experience with wastewater headworks experience, permitting, bidding, construction-phase support, environmental review/ regulatory compliance experience, and grant-funded public infrastructure experience (12), Ability to furnish the required services (10), Approach to the Project (18), Project schedule and time considerations and/or restraints (6), Overall presentation and response to questions (6)

REQUIRED DELIVERABLES

Existing conditions report, Site visit summary, Record review summary, Preliminary alternatives memorandum, Initial project schedule, Environmental screening matrix, Base-data/source-document package, Draft environmental narratives and exhibits, Public notice support documents, Mitigation log, Basis-of-design narrative, Recommended process flow, Design criteria memorandum, City comment response matrix, 25%, 50%, 75%, 90%, And 100% design submittals, Construction Plans, Signed and sealed plans and specifications, Opinion of probable construction cost, Design review response logs, Permit application packages, Agency correspondence log, Permit status tracker, Final permits and approvals, Final bid package, Addenda, Pre-bid meeting materials, Bid review memorandum, Site visit reports, Submittal review logs, RFI log, Change order review memoranda, Commissioning and startup support documents, Punch list and closeout documents, Record drawings, Final engineer certification

REQUIRED ATTACHMENTS

W-9, Contact sheet, E-Verify certification, Debarment/ suspension certification, Public entity crime affidavit, Drug-free workplace certification, Anti-human trafficking affidavit, Byrd Anti-Lobbying Amendment Certification, Conflict of interest certification, Insurance requirements, Foreign Country of Concern Attestation Form, Disclosure of Foreign Influence

REQUIRED STAFFING ROLES

Project Manager, Engineer of Record/ Senior Professional Engineer, Process/ Wastewater Engineer, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Instrumentation and Controls/ SCADA Engineer, Surveyor, Geotechnical Engineer, Environmental Professional, Permitting Specialist, Construction-Phase Services, Grant Compliance/ Reporting Coordinator, Cost Estimator/ Construction Pricing Specialist

24
DAYS REMAINING

You're reading this because they made it public. Your competitor read the board minutes that named this project 6–18 months ago. We read those same minutes. Next time, read them first.

Work in government? Get Civic IQ free →

Frequently asked questions

Common questions about this solicitation, answered from the record.

How do I respond to this RFQ from City of Palatka?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 16, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: City of Palatka City Hall, Attention: Karen Hayes, City Clerk, 201 North 2nd Street, Palatka, Florida 32177. For questions, contact Alex Romero.

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Understanding of the Project (12), Relevant wastewater/headworks experience (12), Qualifications of the proposed team (12), Ability to deliver within grant constraints and schedule (12), Experience wi..." Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from City of Palatka?

All active and historical solicitations from City of Palatka are tracked and searchable. As a city agency, City of Palatka regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

Is this solicitation still open for submissions?

Based on the posted deadline of October 16, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.

What documents are required to bid on this RFQ?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: W-9, Contact sheet, E-Verify certification, Debarment/ suspension certification, Public entity crime affidavit, Drug-free workplace certification, Anti-human trafficking affidavit, Byrd Anti-Lobbying. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from City of Palatka for the complete list.

Can small businesses or minority-owned firms bid on this RFQ?

Most government agencies, including City of Palatka in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFQ submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Alex Romero at (386) 329-0100. Questions and answers are typically shared with all prospective bidders.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Palatka, FL. Review the full solicitation for detailed scope requirements.

What staffing is required for this project?

This solicitation outlines specific staffing requirements. The required roles include: Project Manager, Engineer of Record/ Senior Professional Engineer, Process/ Wastewater Engineer, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Instrumentation and Controls/ SCADA Engineer, Surveyor, Geotechnical Engineer, Environmental Professional, Permitting Specia. Proposers should demonstrate relevant qualifications and experience for each required role.

What are the key deliverables?

The solicitation specifies the following deliverables: Existing conditions report, Site visit summary, Record review summary, Preliminary alternatives memorandum, Initial project schedule, Environmental screening matrix, Base-data/source-document package, Draft environmental narratives and exhibits, Public notice support documents, Mitigation log, Basis. Proposals should clearly address how each deliverable will be met.

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free