RFPOPEN
Save

City of Georgetown Construction Manager at Risk for Fire Station No. 8 - RFP No. 202709 (2026)

San Gabriel Mud 1 logoSan Gabriel Mud 1
Due
Dec 1, 2026
7 days left
Posted
Nov 5, 2026
Contract term
1 year
Primary contact
Nicole Abrego
(512) 930-8454

The 30-second brief

What they're buying

The City of Georgetown is seeking proposals from qualified respondents to serve as a Construction Manager at Risk (CMAR) and provide CMAR services for the construction of a new approximately 12,000 square foot fire station. The scope of work includes staff living, working, and sleeping areas, three pull-through apparatus bays, utilities, sitework improvements, and associated work located at 1901 Westinghouse Rd, Georgetown, TX 78626. The estimated budget is $8,700,000, and the estimated construction timeframe is 365 calendar days. Sealed proposals must be submitted electronically through the City E-bid system on or before December 1, 2026, at 2:30 PM. A non-mandatory pre-proposal conference will be held on November 17, 2026, at 11:00 AM at the Georgetown Municipal Complex, Williamson Room, 300 Industrial Ave, Georgetown, Texas. The deadline for questions is November 20, 2026, at 5:00 PM.

How it's scored

Proposer Team and Key Personnel (25 points), Proposer Experience and Qualifications (25 points), Costing Methodology, Technical Approach and Quality Assurance (25 points), Contractors Work Schedule and Workload (10 points), Cost (15 points), Oral Interview (optional, 25 points)

7 days left to submitDue Dec 1

Bids like this start as pre-RFPs. Get the next ones early.

Get matched pre-RFPs free

Free account · 30-second setup · No credit card

Summary

The City of Georgetown is seeking proposals from qualified respondents to serve as a Construction Manager at Risk (CMAR) and provide CMAR services for the construction of a new approximately 12,000 square foot fire station.

The scope of work includes staff living, working, and sleeping areas, three pull-through apparatus bays, utilities, sitework improvements, and associated work located at 1901 Westinghouse Rd, Georgetown, TX 78626. The estimated budget is $8,700,000, and the estimated construction timeframe is 365 calendar days. Sealed proposals must be submitted electronically through the City E-bid system on or before December 1, 2026, at 2:30 PM. A non-mandatory pre-proposal conference will be held on November 17, 2026, at 11:00 AM at the Georgetown Municipal Complex, Williamson Room, 300 Industrial Ave, Georgetown, Texas. The deadline for questions is November 20, 2026, at 5:00 PM.

EVALUATION CRITERIA

Proposer Team and Key Personnel25 pts
Proposer Experience and Qualifications25 pts
Costing Methodology
Technical Approach and Quality Assurance25 pts
Contractors Work Schedule and Workload10 pts
Cost15 pts
Oral Interview (optional, 25 points)

REQUIRED ATTACHMENTS

9
  • Exhibit A Security Bond
  • Certification and Acknowledgment
  • Certifications Required by the State of Texas
  • Proposer's Company Overview (Appendix A)
  • Key Personnel and Project Reference Form (Appendix B)
  • Proposer's Experience and Qualifications (Appendix C)
  • Proposer's Current Work Schedule and Workload (Appendix D)
  • Proposed Terms and Conditions Exception Form (Appendix E)
  • Proposer's Cost Proposal
Submit to
Online portal, shown to Civic IQ members.Sign up free to see it
Scope location
Georgetown, TX
Projected sq ft
12,000 sq ft
Reported agency
City of Georgetown

Questions about this RFP

How do I respond to this RFP from San Gabriel Mud 1?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 1, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Nicole Abrego.

Can small businesses or minority-owned firms bid on this RFP?

Most government agencies, including San Gabriel Mud 1 in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFP submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Nicole Abrego at (512) 930-8454. Questions and answers are typically shared with all prospective bidders.

Show 6 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Proposer Team and Key Personnel (25 points), Proposer Experience and Qualifications (25 points), Costing Methodology, Technical Approach and Quality Assurance (25 points), Contractors Work Schedule an..." Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from San Gabriel Mud 1?

All active and historical solicitations from San Gabriel Mud 1 are tracked and searchable. As a utility district agency, San Gabriel Mud 1 regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What is the contract term for this solicitation?

The anticipated contract term is 1 year. Contract terms may include renewal options.

Is this solicitation still open for submissions?

Based on the posted deadline of December 1, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.

What documents are required to bid on this RFP?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Exhibit A Security Bond, Certification and Acknowledgment, Certifications Required by the State of Texas, Proposer's Company Overview (Appendix A), Key Personnel and Project Reference Form (Appendix B. Review the full document from San Gabriel Mud 1 for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Georgetown, TX. The total projected area is 12000 sq ft. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

The coverage behind every signal

agencies covered
275,000+agencies covered
buying signals a week
400,000+buying signals a week
decision makers
2.6M+decision makers
in government spend tracked
$14T+in government spend tracked

Trusted by 200+ enterprise teams

Motive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logo

Start finding government buyers today.

Signals from 275,000+ state, local and education agencies, months before the RFP. Free to start.

No credit card required