Central Utah Water Conservancy District - Hades and Docs Diversions Power and Communications Project - 2026
- Due
- Feb 18, 2027
- 86 days left
- Posted
- Aug 31, 2026
- Duration
- 8 months
- Primary contact
- Kirk Beecher
- (801) 226-7193
The 30-second brief
The Central Utah Water Conservancy District is soliciting statements of prequalification for the Hades and Docs Diversions Power and Communications Project located in Duchesne County, Utah. The work includes installation of new underground electrical power and communication circuits, electrical distribution systems, power and fiber handholes, underground conduit, electrical equipment upgrades, and river crossings at the Duchesne River and Hades Creek utilizing a 12-inch steel casing. A mandatory prequalification site visit is scheduled for September 24, 2026, at 9:00 am at the CUWCD Duchesne Field Office, 766 N Center, Duchesne, Utah 84021, and attendance is required to submit a bid. Final bid documents are anticipated in January 2027, with bid opening on February 18, 2027, and construction completion by September 30, 2027.
Underground electrical power conduits, Fiber optic communication conduits, Electrical distribution systems, Power and fiber handholes, Electrical equipment upgrades, River crossings with 12-inch steel casing, Vault drains
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Central Utah Water Conservancy District is soliciting statements of prequalification for the Hades and Docs Diversions Power and Communications Project located in Duchesne County, Utah.
The work includes installation of new underground electrical power and communication circuits, electrical distribution systems, power and fiber handholes, underground conduit, electrical equipment upgrades, and river crossings at the Duchesne River and Hades Creek utilizing a 12-inch steel casing. A mandatory prequalification site visit is scheduled for September 24, 2026, at 9:00 am at the CUWCD Duchesne Field Office, 766 N Center, Duchesne, Utah 84021, and attendance is required to submit a bid. Final bid documents are anticipated in January 2027, with bid opening on February 18, 2027, and construction completion by September 30, 2027.
REQUIRED DELIVERABLES
7- Underground electrical power conduits
- Fiber optic communication conduits
- Electrical distribution systems
- Power and fiber handholes
- Electrical equipment upgrades
- River crossings with 12-inch steel casing
- Vault drains
REQUIRED ATTACHMENTS
Attendance at mandatory Site Visit and signing the attendance roll
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Duchesne County, Utah
Questions about this RFP
How do I respond to this RFP from Central Utah Water Conservancy District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is February 18, 2027. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Kirk Beecher.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Central Utah Water Conservancy District in UT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kirk Beecher at (801) 226-7193. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Underground electrical power conduits, Fiber optic communication conduits, Electrical distribution systems, Power and fiber handholes, Electrical equipment upgrades, River crossings with 12-inch steel casing, Vault drains. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
Where can I find more RFPs from Central Utah Water Conservancy District?
All active and historical solicitations from Central Utah Water Conservancy District are tracked and searchable. As a utility district agency, Central Utah Water Conservancy District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 8 months. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of February 18, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Attendance at mandatory Site Visit and signing the attendance roll. Review the full document from Central Utah Water Conservancy District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Duchesne County, Utah. Review the full solicitation for detailed scope requirements.