Central Utah Water Conservancy District - Hades and Docs Diversion Power and Communications Project - 2026
- Due
- Feb 18, 2027
- 86 days left
- Posted
- Aug 31, 2026
- Primary contact
- Kirk Beecher
- (801) 226-7193
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Central Utah Water Conservancy District invites qualified contractors to submit statements of prequalification for the Hades and Docs Diversion Power and Communications Project in Duchesne County, Utah.
The work includes installing underground electrical power and communication conduits, electrical distribution systems, power and fiber handholes, electrical equipment upgrades, and new power connections along the Hades and Docs feeder pipelines, alongside river crossings at the Duchesne River and Hades Creek using a 12-inch steel casing. A mandatory prequalification site visit is scheduled for September 24, 2026, starting at 9:00 am at the CUWCD Duchesne Field Office, 766 N Center, Duchesne, UT 84021. Final bid documents will be available in January 2027, with bid opening on February 18, 2027. All work must be completed before winter conditions in 2027. The Preliminary Design Report is available at https://cuwcd.projectmates.com.
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Duchesne County, Utah
Questions about this RFP
How do I respond to this RFP from Central Utah Water Conservancy District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is February 18, 2027. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Kirk Beecher.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Central Utah Water Conservancy District in UT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kirk Beecher at (801) 226-7193. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
Where can I find more RFPs from Central Utah Water Conservancy District?
All active and historical solicitations from Central Utah Water Conservancy District are tracked and searchable. As a utility district agency, Central Utah Water Conservancy District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of February 18, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Central Utah Water Conservancy District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Duchesne County, Utah. Review the full solicitation for detailed scope requirements.