Alaska Energy Authority - Bradley Lake 3-Phase Power Long Lead Equipment - ITB # 27009 (2026)
Alaska Industrial Development and Export Authority | State of AlaskaState · Anchorage, AK- Due
- Oct 9, 2026
- Deadline passed
- Posted
- Aug 21, 2026
- Primary contact
- Selwin C. Ray
- (907) 771-3035
The 30-second brief
Alaska Energy Authority is soliciting bids for the purchase and delivery of 3-phase long lead equipment to support the Bradley Lake 3-phase power upgrade. Required commodities include #4/0 ACSR and 350kcmil CU 15kV primary conductor, 12-strand figure-8 optical fiber, pad-mounted 3-phase 600A switch cabinets, padmount reclosers, secondary cable terminal poles, and 2-inch and 6-inch fiberglass short sweep elbows. The estimated budget for this contract is between $2,000,000 and $3,000,000. Bids are due by October 9, 2026, at 1:00 PM Alaska Time and must be submitted via email to [email protected] or delivered to the Anchorage office. The submission must include the completed Bid Schedule, ITB response page 1, Debarment Certificate, and Lobbying Certificate.
#4/0 ACSR "PENGUIN" 6/1 PRIMARY COND. (62, 000 FT); 350 kcmil 1/3 CONC. 15kV CU, 100% PRIMARY COND. (85, 000 FT); FIGURE-8 OPTICAL FIBER (12-STRAND) WITH INTERNAL MESSENGER (15, 000 FT); PAD, THREE PHASE 600A SWITCH CABINET, 15KV PME (1 EA); PADMOUNT RECLOSER, G&W Viper-ST Solid Dielectric SEL 651R (2 EA); ELBOW, CONDUIT 2" FIBERGLASS SHORT SWEEP 45° (52 EA); ELBOW, CONDUIT 2" FIBERGLASS SHORT SWEEP 90° (2 EA); ELBOW, CONDUIT 6" FIBERGLASS SHORT SWEEP 45° (105 EA); ELBOW, CONDUIT 6" FIBERGLASS SHORT SWEEP 90° (3 EA); SECONDARY CABLE TERMINAL POLE (1 EA)
Lowest responsive and responsible bidder
Hear what Alaska Industrial Development and Export Authority | State of Alaska plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Alaska Energy Authority is soliciting bids for the purchase and delivery of 3-phase long lead equipment to support the Bradley Lake 3-phase power upgrade.
Required commodities include #4/0 ACSR and 350kcmil CU 15kV primary conductor, 12-strand figure-8 optical fiber, pad-mounted 3-phase 600A switch cabinets, padmount reclosers, secondary cable terminal poles, and 2-inch and 6-inch fiberglass short sweep elbows. The estimated budget for this contract is between $2,000,000 and $3,000,000. Bids are due by October 9, 2026, at 1:00 PM Alaska Time and must be submitted via email to [email protected] or delivered to the Anchorage office. The submission must include the completed Bid Schedule, ITB response page 1, Debarment Certificate, and Lobbying Certificate.
EVALUATION CRITERIA
Lowest responsive and responsible bidder
REQUIRED DELIVERABLES
10- #4/0 ACSR "PENGUIN" 6/1 PRIMARY COND. (62, 000 FT)
- 350 kcmil 1/3 CONC. 15kV CU, 100% PRIMARY COND. (85, 000 FT)
- FIGURE-8 OPTICAL FIBER (12-STRAND) WITH INTERNAL MESSENGER (15, 000 FT)
- PAD, THREE PHASE 600A SWITCH CABINET, 15KV PME (1 EA)
- PADMOUNT RECLOSER, G&W Viper-ST Solid Dielectric SEL 651R (2 EA)
- ELBOW, CONDUIT 2" FIBERGLASS SHORT SWEEP 45° (52 EA)
- ELBOW, CONDUIT 2" FIBERGLASS SHORT SWEEP 90° (2 EA)
- ELBOW, CONDUIT 6" FIBERGLASS SHORT SWEEP 45° (105 EA)
- ELBOW, CONDUIT 6" FIBERGLASS SHORT SWEEP 90° (3 EA)
- SECONDARY CABLE TERMINAL POLE (1 EA)
REQUIRED ATTACHMENTS
4- Bid Schedule completed as indicated
- ITB response (page 1 of the ITB)
- Debarment Certificate (Appendix B, Page B2 - 4)
- Lobbying Certificate (Appendix B, Page B2 - 5)
- Submit to
- [email protected]
- Scope location
- Anchorage, AK
- Reported agency
- Alaska Energy Authority
Questions about this BID
How do I respond to this Bid from Alaska Industrial Development and Export Authority | State of Alaska?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 9, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Selwin C. Ray.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Alaska Industrial Development and Export Authority | State of Alaska in AK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Selwin C. Ray at (907) 771-3035. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: #4/0 ACSR "PENGUIN" 6/1 PRIMARY COND. (62, 000 FT); 350 kcmil 1/3 CONC. 15kV CU, 100% PRIMARY COND. (85, 000 FT); FIGURE-8 OPTICAL FIBER (12-STRAND) WITH INTERNAL MESSENGER (15, 000 FT); PAD, THREE PHASE 600A SWITCH CABINET, 15KV PME (1 EA); PADMOUNT RECLOSER, G&W Viper-ST Solid Dielectric SEL 651R. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsive and responsible bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Alaska Industrial Development and Export Authority | State of Alaska?
All active and historical solicitations from Alaska Industrial Development and Export Authority | State of Alaska are tracked and searchable. As a state agency, Alaska Industrial Development and Export Authority | State of Alaska regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Schedule completed as indicated, ITB response (page 1 of the ITB), Debarment Certificate (Appendix B, Page B2 - 4), Lobbying Certificate (Appendix B, Page B2 - 5). Review the full document from Alaska Industrial Development and Export Authority | State of Alaska for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Anchorage, AK. Review the full solicitation for detailed scope requirements.