Alaska Industrial Development and Export Authority - Ambler Access Project (AAP) Winter Field Work - AIDEA26-035 (2025)
Alaska Industrial Development and Export Authority | State of AlaskaState · Anchorage, AK- Due
- Dec 18, 2025
- Deadline passed
- Posted
- Dec 5, 2025
- Contract term
- 1 year
- Primary contact
- Kelly Noble
- (907) 771-3909
The 30-second brief
The Alaska Industrial Development and Export Authority is soliciting proposals for winter field work on the Ambler Access Project corridor to collect essential field and coring data, soil samples, and geotechnical information for roadway, embankment, drainage, and bridge foundation design. The scope includes borehole drilling, thermistor installation and monitoring, permafrost drilling, clear-cutting a 20-foot corridor along approximately 204.5 miles starting at Milepost 161 of the Dalton Highway, and sample collection and transfer. Work will occur on lands managed by the Bureau of Land Management, State of Alaska, National Park Service, and private landowners. Proposals are due by December 18, 2025, at 1:00 PM AKST.
Borehole drilling; Thermistor installation and monitoring; Permafrost drilling; Clear-cutting a 20-foot corridor along approximately 204.5 miles; Collection, Labeling, And delivery of subsurface samples
Objectives, Services and Commitments (100), Means and Methods (150), Proposed Project Staff (200), Past Performance (200), Cost Proposal (350)
Hear what Alaska Industrial Development and Export Authority | State of Alaska plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Alaska Industrial Development and Export Authority is soliciting proposals for winter field work on the Ambler Access Project corridor to collect essential field and coring data, soil samples, and geotechnical information for roadway, embankment, drainage, and bridge foundation design.
The scope includes borehole drilling, thermistor installation and monitoring, permafrost drilling, clear-cutting a 20-foot corridor along approximately 204.5 miles starting at Milepost 161 of the Dalton Highway, and sample collection and transfer. Work will occur on lands managed by the Bureau of Land Management, State of Alaska, National Park Service, and private landowners. Proposals are due by December 18, 2025, at 1:00 PM AKST.
EVALUATION CRITERIA
REQUIRED DELIVERABLES
5- Borehole drilling
- Thermistor installation and monitoring
- Permafrost drilling
- Clear-cutting a 20-foot corridor along approximately 204.5 miles
- Collection, Labeling, And delivery of subsurface samples
REQUIRED ATTACHMENTS
7- Bid bond
- Cost proposal
- Alaska Bidder/Offeror/Veteran Preference Certification Form
- Former Employee Certificate of Eligibility
- Certification Regarding Debarment
- Suspension
- Ineligibility and Voluntary Exclusion
- Submit to
- [email protected]
- Scope location
- Anchorage, AK
- Reported agency
- Alaska Industrial Development and Export Authority
Questions about this RFP
How do I respond to this RFP from Alaska Industrial Development and Export Authority | State of Alaska?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 18, 2025. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Kelly Noble.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Alaska Industrial Development and Export Authority | State of Alaska in AK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kelly Noble at (907) 771-3909. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Borehole drilling; Thermistor installation and monitoring; Permafrost drilling; Clear-cutting a 20-foot corridor along approximately 204.5 miles; Collection, Labeling, And delivery of subsurface samples. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Objectives, Services and Commitments (100), Means and Methods (150), Proposed Project Staff (200), Past Performance (200), Cost Proposal (350)" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Alaska Industrial Development and Export Authority | State of Alaska?
All active and historical solicitations from Alaska Industrial Development and Export Authority | State of Alaska are tracked and searchable. As a state agency, Alaska Industrial Development and Export Authority | State of Alaska regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid bond, Cost proposal, Alaska Bidder/Offeror/Veteran Preference Certification Form, Former Employee Certificate of Eligibility, Certification Regarding Debarment, Suspension, Ineligibility and Volun. Review the full document from Alaska Industrial Development and Export Authority | State of Alaska for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Anchorage, AK. Review the full solicitation for detailed scope requirements.