Washington State Department of Transportation US 12 US 101 Grays Harbor County Movable Bridges PDB 2026
Washington State Department of TransportationState · Olympia, WA- Due
- Jun 21, 2027
- 208 days left
- Posted
- Nov 13, 2026
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
WSDOT plans to rehabilitate and preserve five movable bridges on US 12 and US 101 in Aberdeen and Hoquiam using progressive design-build delivery.
The bridges include bascule, swing, and vertical-lift spans dating from the 1920s through 1970, requiring structural rehabilitation, bridge decks, steel members, bearings, piers, foundations, approach components, painting and corrosion protection, protective coatings, movable-bridge mechanical systems, operating machinery, electrical and controls systems, power distribution, motors and drives, bridge wiring, cables, lighting, and traffic safety equipment. The estimated contract value ranges from $235 million to $285 million.
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Aberdeen, WA
View all Bridges & structures RFPs →
Questions about this RFP
How do I respond to this RFP from Washington State Department of Transportation?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 21, 2027. Submissions go to the agency's online bid portal; Civic IQ members see the exact link.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Washington State Department of Transportation in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Show 4 more questions
Where can I find more RFPs from Washington State Department of Transportation?
All active and historical solicitations from Washington State Department of Transportation are tracked and searchable. As a state agency, Washington State Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of June 21, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Washington State Department of Transportation for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Aberdeen, WA. Review the full solicitation for detailed scope requirements.