Virgin Islands Port Authority - Removal and Replacement of HVAC Chiller #1 at Cyril E King Airport - VIPA-ITB(STTJ)-2026-27 Addendum 2 (2026)
- Due
- Aug 17, 2026
- Deadline passed
- Posted
- Jul 16, 2026
- Primary contact
- Khadila D Joseph
The 30-second brief
The Virgin Islands Port Authority is seeking bids from a qualified licensed contractor to safely remove and replace the existing operational Chiller #1 located on the roof of the Cyril E. King Terminal Building, St. Thomas, USVI. The Contractor shall provide all labor, supervision, materials, equipment, tools, rigging, hoisting, crane services if required, safety controls, temporary protection, permits, coordination, disposal, and incidentals necessary to complete the HVAC chiller replacement work. Responses must be submitted electronically via the Authority e-Procurement platform, Ionwave, by August 17, 2026 at 2:00 PM AST. A mandatory site-visit is scheduled for July 28, 2026 at 9:00 AM AST. A proposal bond of 10% and payment and performance bonds are required.
Mobilization, Chiller Purchase and Delivery, Chiller Installation (Labor and Material), Allowance
Hear what Virgin Islands Port Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Virgin Islands Port Authority is seeking bids from a qualified licensed contractor to safely remove and replace the existing operational Chiller #1 located on the roof of the Cyril E. King Terminal Building, St.
Thomas, USVI. The Contractor shall provide all labor, supervision, materials, equipment, tools, rigging, hoisting, crane services if required, safety controls, temporary protection, permits, coordination, disposal, and incidentals necessary to complete the HVAC chiller replacement work. Responses must be submitted electronically via the Authority e-Procurement platform, Ionwave, by August 17, 2026 at 2:00 PM AST. A mandatory site-visit is scheduled for July 28, 2026 at 9:00 AM AST. A proposal bond of 10% and payment and performance bonds are required.
REQUIRED DELIVERABLES
4- Mobilization
- Chiller Purchase and Delivery
- Chiller Installation (Labor and Material)
- Allowance
REQUIRED ATTACHMENTS
12- Business License
- SAM Debarment and Certification
- Certificate of Good Standing
- Articles of Incorporation or Organization
- Certificate of Issuance or Renewal of Trade Name
- Certificate of General Liability Insurance
- AutoLiability Insurance
- Certificate of Government Insurance
- Certificate of Corporate Resolution
- Respondent Proposal
- Payment and Performance Bonds
- Proposal Bond
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- St. Thomas, VI
Questions about this BID
How do I respond to this Bid from Virgin Islands Port Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is August 17, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Khadila D Joseph.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Virgin Islands Port Authority in VI, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Khadila D Joseph. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Mobilization, Chiller Purchase and Delivery, Chiller Installation (Labor and Material), Allowance. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Virgin Islands Port Authority?
All active and historical solicitations from Virgin Islands Port Authority are tracked and searchable. As a airport authority agency, Virgin Islands Port Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Business License, SAM Debarment and Certification, Certificate of Good Standing, Articles of Incorporation or Organization, Certificate of Issuance or Renewal of Trade Name, Certificate of General Lia. Review the full document from Virgin Islands Port Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: St. Thomas, VI. Review the full solicitation for detailed scope requirements.