RFPOPEN

Ventura River Water District SCADA Maintenance and Support Services RFP - VRWD-2026-02

Ventura River Water District, Ojai, CA·Utility District

43 days until submission deadline — November 2, 2026

Track Ventura River Water District solicitations

Get alerted when Ventura River Water District posts a new RFP, and see the pre-RFP signals months before it publishes.

Get started free

Create a free account · no credit card

Sep 17, 2026
Posted Date
Nov 02, 2026
Submission Deadline
Contract Term
3 years
Scope Location
Ojai, CA
Submission Address
[email protected]

SUMMARY

Ventura River Water District seeks proposals for on-call Supervisory Control and Data Acquisition (SCADA) maintenance, troubleshooting, programming, support, documentation, and related technical services for its potable water system. The current SCADA architecture utilizes ClearSCADA (Geo SCADA) with Schneider Electric SCADAPack 350 E and 334 controllers, Win911 alarm notification, and Trio ER45e spread spectrum radios connecting three separate sites comprising four wells, two booster stations, one chlorination station, and three water reservoirs. Services include routine troubleshooting, HMI graphics and PLC logic programming, system upgrades, calibration and testing of instrumentation, emergency response support on a 24/7 basis with a 4-hour response time for critical issues, and future upgrade planning. The initial contract term is 3 years with optional extensions. Proposals are due by November 2, 2026, at 4:00 p.m. Pacific Time.

EVALUATION CRITERIA

Qualifications & experience with potable water utility SCADA systems (25%), Understanding of scope, work plan, and approach (25%), Emergency response capability and availability (20%), Project team, certifications, and technical resources (10%), Cost proposal and overall value (10%), Proximity to District (10%)

REQUIRED ATTACHMENTS

Cover letter signed by an individual authorized to bind the firm, Statement of proposal validity for not less than 90 calendar days

43
DAYS REMAINING

You're reading this because they made it public. Your competitor read the board minutes that named this project 6–18 months ago. We read those same minutes. Next time, read them first.

Work in government? Get Civic IQ free →

Frequently asked questions

Common questions about this solicitation, answered from the record.

How do I respond to this RFP from Ventura River Water District?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 2, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected].

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Qualifications & experience with potable water utility SCADA systems (25%), Understanding of scope, work plan, and approach (25%), Emergency response capability and availability (20%), Project team, c..." Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Ventura River Water District?

All active and historical solicitations from Ventura River Water District are tracked and searchable. As a utility district agency, Ventura River Water District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What is the contract term for this solicitation?

The anticipated contract term is 3 years. Contract terms may include renewal options.

Is this solicitation still open for submissions?

Based on the posted deadline of November 2, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.

What documents are required to bid on this RFP?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Cover letter signed by an individual authorized to bind the firm, Statement of proposal validity for not less than 90 calendar days. Review the full document from Ventura River Water District for the complete list.

Can small businesses or minority-owned firms bid on this RFP?

Most government agencies, including Ventura River Water District in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFP submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Ojai, CA. Review the full solicitation for detailed scope requirements.

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free