Truckee Meadows Water Authority - Spring Creek Zone Conversion Phase 2 - 2026
- Due
- Jul 15, 2026
- Deadline passed
- Posted
- Jun 17, 2026
- Primary contact
- Mindy Stewart
The 30-second brief
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for labor, materials, equipment, and incidentals required for the demolition and lawful disposal of two (2) welded steel potable water storage tanks and the installation of 10-inch and 12-inch ductile iron water mains. Additional work includes concrete sidewalk, driveway approach, curb and gutter, permanent asphalt concrete pavement patching, and the demolition and modification of other water facilities in Washoe County, Nevada. The project is deemed a Horizontal Construction Project with an engineer's estimate of $240,846 to $294,368. Bids are due by July 15, 2026.
Demolition and lawful disposal of two (2) welded steel potable water storage tanks; Installation of 10-inch and 12-inch ductile iron water mains; Concrete sidewalk, Driveway approach, And curb & gutter; Permanent asphalt concrete pavement patching; Demolition and modification of other water facilities
Hear what Truckee Meadows Water Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for labor, materials, equipment, and incidentals required for the demolition and lawful disposal of two (2) welded steel potable water storage tanks and the installation of 10-inch and 12-inch ductile iron water mains.
Additional work includes concrete sidewalk, driveway approach, curb and gutter, permanent asphalt concrete pavement patching, and the demolition and modification of other water facilities in Washoe County, Nevada. The project is deemed a Horizontal Construction Project with an engineer's estimate of $240,846 to $294,368. Bids are due by July 15, 2026.
REQUIRED DELIVERABLES
5- Demolition and lawful disposal of two (2) welded steel potable water storage tanks
- Installation of 10-inch and 12-inch ductile iron water mains
- Concrete sidewalk, Driveway approach, And curb & gutter
- Permanent asphalt concrete pavement patching
- Demolition and modification of other water facilities
REQUIRED ATTACHMENTS
01. Instructions to Bidders - Rev. 08.2025.pdf, 02. Bid Bond.pdf, 03. Disclosure of Ownership and Vendor Information.pdf, 04. Reference Projects and Personnel.pdf, 05. Contractor 5% Subcontractor List.pdf, 06. Contractor 1% Subcontractor List.pdf, 07. Conflict of Interest Disclosure Form.pdf, 08. Certification Regarding Debarment.pdf, 09. Local Preference Affidavit NGEM.pdf, 10. TMWA End User Data Agreement.pdf, 11. MASTER_FORM_Public_Work_General_Conditions_v17_07.2025.pdf, 10-0001.118 Spring Creek Zone Conversion Phase 2_00 73 00 Supplementary Conditions.pdf, 10-0001.118 Spring Creek Zone Conversion Phase 2_Technical Specifications_BID SET.pdf, 10-0001.118 Spring Creek Zone Conversion Phase 2_Improvement Plans_BID SET.pdf, Spring Creek 1 and 2 Tanks Lead Paint and Asbestos Survey Report.pdf, Sample Construction Agreement - Spring Creek Zone Conversion Phase 2.pdf
- Submit to
- https://www.demandstar.com/app/limited/bids/539325/details
- Scope location
- Washoe County, NV
Questions about this BID
How do I respond to this Bid from Truckee Meadows Water Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is July 15, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://www.demandstar.com/app/limited/bids/539325/details. For questions, contact Mindy Stewart.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Truckee Meadows Water Authority in NV, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Mindy Stewart. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Demolition and lawful disposal of two (2) welded steel potable water storage tanks; Installation of 10-inch and 12-inch ductile iron water mains; Concrete sidewalk, Driveway approach, And curb & gutter; Permanent asphalt concrete pavement patching; Demolition and modification of other water faciliti. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Truckee Meadows Water Authority?
All active and historical solicitations from Truckee Meadows Water Authority are tracked and searchable. As a utility district agency, Truckee Meadows Water Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: 01. Instructions to Bidders - Rev. 08.2025.pdf, 02. Bid Bond.pdf, 03. Disclosure of Ownership and Vendor Information.pdf, 04. Reference Projects and Personnel.pdf, 05. Contractor 5% Subcontractor List. Review the full document from Truckee Meadows Water Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Washoe County, NV. Review the full solicitation for detailed scope requirements.