Town of Milton Granite Avenue Pump Station Scoping Engineering Design RFQ BRIC22-0016
Town of MiltonCity · Milton, MA- Due
- Aug 1, 2024
- Deadline passed
- Posted
- Jul 11, 2024
Know who Milton buys from before you write a word.
Every vendor contract, renewal date and decision maker at this agency, in one place.
Set up in 30 seconds · No credit card
THE 30-SECOND BRIEF
The Town of Milton Engineering Department is requesting qualification proposals for consulting engineering services funded by the Building Resilient Infrastructure and Communities (BRIC) program. The project involves the development of preliminary (conceptual) and final design plans for resiliency improvements to the Granite Avenue Pump Station. Scope includes reviewing existing record drawings, feasibility confirmation, sewer pump station design, and floodplain and vulnerability assessments. Minimum criteria require firms to be licensed in Massachusetts and demonstrate experience in sewer pump station projects and cost-effective resiliency designs. Proposals are due by August 1, 2024, at 11:00 AM. The selection process is qualifications-based.
Documentation of in-house abilities, Experience, Certifications, Licensures, References
Experience in sewer pump station design, floodplain and vulnerability assessments, track record of on-time/on-budget delivery, in-house resources, ability to develop cost-effective resiliency designs
SUMMARY
The Town of Milton Engineering Department is requesting qualification proposals for consulting engineering services funded by the Building Resilient Infrastructure and Communities (BRIC) program.
The project involves the development of preliminary (conceptual) and final design plans for resiliency improvements to the Granite Avenue Pump Station. Scope includes reviewing existing record drawings, feasibility confirmation, sewer pump station design, and floodplain and vulnerability assessments. Minimum criteria require firms to be licensed in Massachusetts and demonstrate experience in sewer pump station projects and cost-effective resiliency designs. Proposals are due by August 1, 2024, at 11:00 AM. The selection process is qualifications-based.
EVALUATION CRITERIA
5- Experience in sewer pump station design
- Floodplain and vulnerability assessments
- Track record of on-time/on-budget delivery
- In-house resources
- Ability to develop cost-effective resiliency designs
REQUIRED DELIVERABLES
5- Documentation of in-house abilities
- Experience
- Certifications
- Licensures
- References
REQUIRED ATTACHMENTS
https://www.miltonma.gov/DocumentCenter/View/9830, https://www.miltonma.gov/DocumentCenter/View/9936
- Scope location
- Milton, MA
Questions about this RFP
How do I respond to this RFQ from Town of Milton?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is August 1, 2024. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Town of Milton in MA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Documentation of in-house abilities, Experience, Certifications, Licensures, References. Proposals should clearly address how each deliverable will be met.
Can I search RFQs like this in ChatGPT or Claude?
Yes. Civic IQ has an MCP server that connects ChatGPT, Claude and other AI assistants to live Civic IQ data: open RFPs, pre-RFP signals from public meetings, awarded contracts and agency decision-makers across 100,000+ US public agencies. Add https://beta.mcp.civiciq.com/mcp as a connector (in ChatGPT under Settings > Apps & Connectors, in Claude under Settings > Connectors) and sign in with a free Civic IQ account at civiciq.com/mcp.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Experience in sewer pump station design, floodplain and vulnerability assessments, track record of on-time/on-budget delivery, in-house resources, ability to develop cost-effective resiliency designs" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Town of Milton?
All active and historical solicitations from Town of Milton are tracked and searchable. As a city agency, Town of Milton regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: https://www.miltonma.gov/DocumentCenter/View/9830, https://www.miltonma.gov/DocumentCenter/View/9936. Review the full document from Town of Milton for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Milton, MA. Review the full solicitation for detailed scope requirements.