Toho Water Authority 16-Inch Force Main from Simpson Road to the Parkway Water Reclamation Facility WRF 2026
- Due
- Dec 17, 2026
- 25 days left
- Primary contact
- Brian Grover
- (407) 944-5000
The 30-second brief
Toho Water Authority seeks bids for sewer force main replacement in Osceola, FL, including approximately 1,930 LF of 16-inch PVC and 1,580 LF of 20-inch HDPE force main, plus fittings, valves, asbestos cement pipe abandonment, and site restoration. Submission deadline is December 17, 2026 at 2:00 PM. Questions due by November 30, 2026 at 5:00 PM.
1, 930 LF of 16" pvc (c900/dr18) force main, 1, 580 LF of 20" hdpe (dr-11) force main, 35 LF of 6" pvc (c900/dr18) force main, Removal and abandonment/grouting of existing force main systems (including asbestos cement pipe), Connections to existing force mains and stub-outs, Associated fittings, Valves, And appurtenances, Testing and commissioning, Site restoration
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Toho Water Authority seeks bids for sewer force main replacement in Osceola, FL, including approximately 1,930 LF of 16-inch PVC and 1,580 LF of 20-inch HDPE force main, plus fittings, valves, asbestos cement pipe abandonment, and site restoration.
Submission deadline is December 17, 2026 at 2:00 PM. Questions due by November 30, 2026 at 5:00 PM.
REQUIRED DELIVERABLES
1, 930 LF of 16" pvc (c900/dr18) force main, 1, 580 LF of 20" hdpe (dr-11) force main, 35 LF of 6" pvc (c900/dr18) force main, Removal and abandonment/grouting of existing force main systems (including asbestos cement pipe), Connections to existing force mains and stub-outs, Associated fittings, Valves, And appurtenances, Testing and commissioning, Site restoration
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Osceola, FL
Questions about this BID
How do I respond to this Bid from Toho Water Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 17, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Brian Grover.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Toho Water Authority in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Brian Grover at (407) 944-5000. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 1, 930 LF of 16" pvc (c900/dr18) force main, 1, 580 LF of 20" hdpe (dr-11) force main, 35 LF of 6" pvc (c900/dr18) force main, Removal and abandonment/grouting of existing force main systems (including asbestos cement pipe), Connections to existing force mains and stub-outs, Associated fittings, Val. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from Toho Water Authority?
All active and historical solicitations from Toho Water Authority are tracked and searchable. As a utility district agency, Toho Water Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 17, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Toho Water Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Osceola, FL. Review the full solicitation for detailed scope requirements.