South Dakota Department of Transportation - Unbonded Concrete Overlay on US Highway 18 - NH 0018(261)263, 2026
- Due
- Nov 18, 2026
- Deadline passed
- Primary contact
- Doug Sherman
- (605) 842-0810
The 30-second brief
South Dakota Department of Transportation is seeking bids for an unbonded concrete overlay and nonreinforced Portland cement concrete shoulders with asphalt shoulders on US Highway 18 in Gregory and Tripp Counties, federal project NH 0018(261)263, PCN 08G7. The project involves surfacing, concrete paving, traffic control, grading, and associated earthwork over 9.742 miles. Bids are due by November 18, 2026, at 10:00 A.M. Central time, to be submitted electronically via the South Dakota Electronic Bid System (SDEBS). Field work completion is required by November 19, 2027, with a 45-calendar-day closure requirement for US 18 paving operations.
Unbonded concrete overlay, Nonreinforced PCC pavement, Asphalt shoulders, Concrete paving, Grading, Pavement marking, Signing, Erosion control
Price, qualifications
Hear what South Dakota Aeronautics Commission | State of South Dakota plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
South Dakota Department of Transportation is seeking bids for an unbonded concrete overlay and nonreinforced Portland cement concrete shoulders with asphalt shoulders on US Highway 18 in Gregory and Tripp Counties, federal project NH 0018(261)263, PCN 08G7.
The project involves surfacing, concrete paving, traffic control, grading, and associated earthwork over 9.742 miles. Bids are due by November 18, 2026, at 10:00 A.M. Central time, to be submitted electronically via the South Dakota Electronic Bid System (SDEBS). Field work completion is required by November 19, 2027, with a 45-calendar-day closure requirement for US 18 paving operations.
EVALUATION CRITERIA
Price, qualifications
REQUIRED DELIVERABLES
8- Unbonded concrete overlay
- Nonreinforced PCC pavement
- Asphalt shoulders
- Concrete paving
- Grading
- Pavement marking
- Signing
- Erosion control
REQUIRED ATTACHMENTS
6- Bid proposal
- Contract bond
- Certification regarding lobbying
- Fuel adjustment affidavit
- Standard title VI assurance
- Equal employment opportunity requirements
REQUIRED STAFFING
6- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Gregory, SD
- Projected sq ft
- 35,009 sq ft
- Reported agency
- South Dakota Department of Transportation
Questions about this BID
How do I respond to this Bid from South Dakota Aeronautics Commission | State of South Dakota?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Doug Sherman.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including South Dakota Aeronautics Commission | State of South Dakota in SD, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Doug Sherman at (605) 842-0810. Questions and answers are typically shared with all prospective bidders.
What staffing is required for this project?
This solicitation outlines specific staffing requirements. The required roles include: Laborers, power equipment operators, truck drivers, electricians, iron workers, painters. Proposers should demonstrate relevant qualifications and experience for each required role.
What are the key deliverables?
The solicitation specifies the following deliverables: Unbonded concrete overlay, Nonreinforced PCC pavement, Asphalt shoulders, Concrete paving, Grading, Pavement marking, Signing, Erosion control. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price, qualifications" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from South Dakota Aeronautics Commission | State of South Dakota?
All active and historical solicitations from South Dakota Aeronautics Commission | State of South Dakota are tracked and searchable. As a state agency, South Dakota Aeronautics Commission | State of South Dakota regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid proposal, contract bond, certification regarding lobbying, fuel adjustment affidavit, standard title VI assurance, equal employment opportunity requirements. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from South Dakota Aeronautics Commission | State of South Dakota for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Gregory, SD. The total projected area is 35009 sq ft. Review the full solicitation for detailed scope requirements.