SECO Energy Pre-Qualifier Overhead Electric Transmission Line with Distribution Underbuild Services RFQ 2026-38
Sumter Electric Cooperative, Inc.Utility District · FL- Due
- May 6, 2026
- Deadline passed
- Posted
- Apr 22, 2026
- Primary contact
- Substation Engineering Group Bid
Hear what Sumter Electric Cooperative, Inc. plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
SECO Energy is seeking to prequalify experienced contractors for Overhead Electric Transmission Line with Distribution Underbuild services for an upcoming RFP. The project involves furnishing all labor, supervision, equipment, and incidental materials necessary for the construction of overhead electric 69kV transmission facilities and associated distribution underbuild across approximately 2000 square miles of service territory in Florida.
Responses must cover all aspects of the Scope of Work and be submitted via VendorLink by May 6, 2026. Only vendors prequalified through this RFQ will be invited to submit bids for the subsequent construction RFP. Pricing will not be evaluated or accepted at this stage.
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Florida, FL
- Reported agency
- SECO Energy
Questions about this RFQ
How do I respond to this RFQ from Sumter Electric Cooperative, Inc.?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 6, 2026. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Substation Engineering Group Bid.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Sumter Electric Cooperative, Inc. in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Substation Engineering Group Bid. Questions and answers are typically shared with all prospective bidders.
Show 3 more questions
Where can I find more RFPs from Sumter Electric Cooperative, Inc.?
All active and historical solicitations from Sumter Electric Cooperative, Inc. are tracked and searchable. As a utility district agency, Sumter Electric Cooperative, Inc. regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Sumter Electric Cooperative, Inc. for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Florida, FL. Review the full solicitation for detailed scope requirements.