School District of Manatee County - Uninterruptible Power Supply (UPS) E-Rate Equipment - RFP 28-0003-KCD (2026)
- Due
- Jan 6, 2027
- 47 days left
- Posted
- Nov 17, 2026
- Duration
- 15 months
- Primary contact
- Kimberlie Dufon
- (941) 708-8770 ext 41204
The 30-second brief
The School District of Manatee County, Florida is seeking competitive, sealed proposals for the procurement and drop shipment of ninety-one (91) Uninterruptible Power Supply (UPS) units with Lithium-Ion (LiFePO4) battery technology to support network infrastructure across designated district facilities. The requested equipment is classified as E-rate Category 2 Internal Connections (Uninterruptible Power Supply / Battery Backup) and must include manufacturers American Power Conversion (APC), Allis Electric CO. (AEC), Vertiv, or equivalent. The contract term commences on July 1, 2027 through September 30, 2028. Proposals are due by January 6, 2027 at 3:00 p.m. E.T. via VendorLink, with questions due by December 1, 2026.
91 Each Uninterruptible Power Supply (UPS) units with Lithium-Ion (LiFePO4) battery technology (3000 VA or equivalent supporting 40 to 60 minutes uptime at 4000W); Antennas, Connectors, And related components
Total Cost of E-Rate Eligible Equipment (UPS Hardware, and Freight): 55, Technical Specifications & Compliance: Adherence to Lithium Battery Specifications, VA/Watt Capacity, Form Factor, and Rack Features: 25, Equipment Warranty & Support Period: Compliance with the required 5-year full system/battery advance replacement warranty: 20, Cover Letter: Pass/Fail
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The School District of Manatee County, Florida is seeking competitive, sealed proposals for the procurement and drop shipment of ninety-one (91) Uninterruptible Power Supply (UPS) units with Lithium-Ion (LiFePO4) battery technology to support network infrastructure across designated district facilities.
The requested equipment is classified as E-rate Category 2 Internal Connections (Uninterruptible Power Supply / Battery Backup) and must include manufacturers American Power Conversion (APC), Allis Electric CO. (AEC), Vertiv, or equivalent. The contract term commences on July 1, 2027 through September 30, 2028. Proposals are due by January 6, 2027 at 3:00 p.m. E.T. via VendorLink, with questions due by December 1, 2026.
EVALUATION CRITERIA
Total Cost of E-Rate Eligible Equipment (UPS Hardware, and Freight): 55, Technical Specifications & Compliance: Adherence to Lithium Battery Specifications, VA/Watt Capacity, Form Factor, and Rack Features: 25, Equipment Warranty & Support Period: Compliance with the required 5-year full system/battery advance replacement warranty: 20, Cover Letter: Pass/Fail
REQUIRED DELIVERABLES
91 Each Uninterruptible Power Supply (UPS) units with Lithium-Ion (LiFePO4) battery technology (3000 VA or equivalent supporting 40 to 60 minutes uptime at 4000W); Antennas, Connectors, And related components
REQUIRED ATTACHMENTS
Invitation to Proposal Form, Pricing, Delivery and Warranty Submittal, References, No Bid Response Submittal Form OR Bidder Acknowledgement, Bidder’s Experience and Qualifications, Bidder’s Statement of Principal Place of Business, Bidder’s Statement of Financial Qualification, Drug-free Workplace Certification, Debarment and Suspension Certification, Scrutinized Company Certification, Byrd Anti-Lobbying Amendment, Anti-Discrimination Amendment, Employment Eligibility Verification (E-VERIFY), Contractor Affidavit Regarding the Use of Coercion for Labor and Services
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Bradenton, FL
- Reported agency
- School District of Manatee County
Questions about this RFP
How do I respond to this RFP from Manatee County School District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 6, 2027. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Kimberlie Dufon.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Manatee County School District in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kimberlie Dufon at (941) 708-8770 ext 41204. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 91 Each Uninterruptible Power Supply (UPS) units with Lithium-Ion (LiFePO4) battery technology (3000 VA or equivalent supporting 40 to 60 minutes uptime at 4000W); Antennas, Connectors, And related components. Proposals should clearly address how each deliverable will be met.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Total Cost of E-Rate Eligible Equipment (UPS Hardware, and Freight): 55, Technical Specifications & Compliance: Adherence to Lithium Battery Specifications, VA/Watt Capacity, Form Factor, and Rack Fea..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Manatee County School District?
All active and historical solicitations from Manatee County School District are tracked and searchable. As a school agency, Manatee County School District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 15 months. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of January 6, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Invitation to Proposal Form, Pricing, Delivery and Warranty Submittal, References, No Bid Response Submittal Form OR Bidder Acknowledgement, Bidder’s Experience and Qualifications, Bidder’s Statement. Review the full document from Manatee County School District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Bradenton, FL. Review the full solicitation for detailed scope requirements.