Raleigh Durham Airport Authority - Control Panel Upgrade for Lift Stations 1A & 1B - 2026
- Due
- Jun 11, 2026
- Deadline passed
- Posted
- May 26, 2026
- Primary contact
- Aprile King
The 30-second brief
The Raleigh Durham Airport Authority seeks bids for the Control Panel Upgrade for Lift Stations 1A & 1B in Wake County, NC. The scope of work includes the removal of existing control panels for Gorman Rupp pumps at LS1A and installation of new control panels, conduit, wiring, 15hp pump connections, Rosemont Level Sensors, RTUs at LS1B, 5G radios, Trihedral VT SCADA Software with 200 Tag Runtime License, Full Historian, and alarm notifications. Additional specifications include NEMA 4X 304 SS enclosures, Schneider Electric Scadapak 474 PLCs, UPS units, and industrial PCs. Submissions are due by June 11, 2026. A recommended site visit is scheduled for June 1, 2026, at 200 Haley’s Branch Rd, Cary.
Removal of existing control panel for Gorman Rupp pumps at LS1A; Installation of new control panel adjacent LS1A Hut; Replace existing power wire from Main Breaker Panel to new Control Panel; Install new conduit and wire to each 15hp Gorman Rupp pump; Install new Rosemont Level Sensor at the top of the existing wet well; Install new RTU at LS1B; Trihedral VT SCADA Software with 200 Tag Runtime License and Full Historian; 5G radios at both sites
Hear what Raleigh Durham Airport Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Raleigh Durham Airport Authority seeks bids for the Control Panel Upgrade for Lift Stations 1A & 1B in Wake County, NC. The scope of work includes the removal of existing control panels for Gorman Rupp pumps at LS1A and installation of new control panels, conduit, wiring, 15hp pump connections, Rosemont Level Sensors, RTUs at LS1B, 5G radios, Trihedral VT SCADA Software with 200 Tag Runtime License, Full Historian, and alarm notifications.
Additional specifications include NEMA 4X 304 SS enclosures, Schneider Electric Scadapak 474 PLCs, UPS units, and industrial PCs. Submissions are due by June 11, 2026. A recommended site visit is scheduled for June 1, 2026, at 200 Haley’s Branch Rd, Cary.
REQUIRED DELIVERABLES
8- Removal of existing control panel for Gorman Rupp pumps at LS1A
- Installation of new control panel adjacent LS1A Hut
- Replace existing power wire from Main Breaker Panel to new Control Panel
- Install new conduit and wire to each 15hp Gorman Rupp pump
- Install new Rosemont Level Sensor at the top of the existing wet well
- Install new RTU at LS1B
- Trihedral VT SCADA Software with 200 Tag Runtime License and Full Historian
- 5G radios at both sites
REQUIRED ATTACHMENTS
Control Panel upgrade for Lift Stations 1A & 1B
- Submit to
- https://www.demandstar.com/app/limited/bids/536101/details
- Scope location
- Wake County, NC
Questions about this BID
How do I respond to this Bid from Raleigh Durham Airport Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 11, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://www.demandstar.com/app/limited/bids/536101/details. For questions, contact Aprile King.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Raleigh Durham Airport Authority in NC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Aprile King. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Removal of existing control panel for Gorman Rupp pumps at LS1A; Installation of new control panel adjacent LS1A Hut; Replace existing power wire from Main Breaker Panel to new Control Panel; Install new conduit and wire to each 15hp Gorman Rupp pump; Install new Rosemont Level Sensor at the top of. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Raleigh Durham Airport Authority?
All active and historical solicitations from Raleigh Durham Airport Authority are tracked and searchable. As a airport authority agency, Raleigh Durham Airport Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Control Panel upgrade for Lift Stations 1A & 1B. Review the full document from Raleigh Durham Airport Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Wake County, NC. Review the full solicitation for detailed scope requirements.