Missouri Department of Transportation Route 94 Resurfacing and Bridge Rehabilitation Bid - JCD0294 (2026)
- Due
- Nov 20, 2026
- Due today
- Primary contact
- State Design Engineer
- (573) 751-2876
The 30-second brief
The Missouri Department of Transportation is seeking bids for highway construction work under Contract ID 261120-D07, Federal Project Number FAF 94-1(39). The project involves resurfacing and two bridge rehabilitations along Route 94 in Callaway and Montgomery Counties, spanning a total length of 31.162 miles from east of the Route 63/54 interchange to east of Bluffton. Scope includes roadway items, bituminous pavement mixture PG64-22, asphaltic concrete mixture, crushed stone, guardrail installation, signing items, pavement marking paint, barrier end modifications, and county road aggregate base. Electronic bids must be submitted through the Bid Express website by November 20, 2026, at 11:00 a.m. Bidders must submit a Contractor Prequalification Questionnaire at least seven days prior to bid opening and provide a bid guaranty.
Removal of improvements, Shaping slopes, Gravel or crushed stone, Bituminous pavement mixture PG64-22 surface leveling, Asphaltic concrete mixture, Tack coat, Construction signs, Channelizer, Changeable message sign, Mobilization, Preformed thermoplastic pavement marking, White and yellow class 1 pavement marking paint, Modified coldmilling, Bituminous shoulder and centerline rumble strips, MGS guardrail, Bridge approach transition sections, MGS end anchor, Bridge anchor section, Asymmetrical transition section, Crashworthy end terminal, U-channel post, PSST post, Concrete post anchor, Flat sheet fluorescent signs, Barrier end modifications, Excavation and preparation of roadbed, County road type 1 aggregate for base, Bituminous pavement mixture PG64-22 base
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Missouri Department of Transportation is seeking bids for highway construction work under Contract ID 261120-D07, Federal Project Number FAF 94-1(39).
The project involves resurfacing and two bridge rehabilitations along Route 94 in Callaway and Montgomery Counties, spanning a total length of 31.162 miles from east of the Route 63/54 interchange to east of Bluffton. Scope includes roadway items, bituminous pavement mixture PG64-22, asphaltic concrete mixture, crushed stone, guardrail installation, signing items, pavement marking paint, barrier end modifications, and county road aggregate base. Electronic bids must be submitted through the Bid Express website by November 20, 2026, at 11:00 a.m. Bidders must submit a Contractor Prequalification Questionnaire at least seven days prior to bid opening and provide a bid guaranty.
REQUIRED DELIVERABLES
28- Removal of improvements
- Shaping slopes
- Gravel or crushed stone
- Bituminous pavement mixture PG64-22 surface leveling
- Asphaltic concrete mixture
- Tack coat
- Construction signs
- Channelizer
- Changeable message sign
- Mobilization
- Preformed thermoplastic pavement marking
- White and yellow class 1 pavement marking paint
- Modified coldmilling
- Bituminous shoulder and centerline rumble strips
- MGS guardrail
- Bridge approach transition sections
- MGS end anchor
- Bridge anchor section
- Asymmetrical transition section
- Crashworthy end terminal
- U-channel post
- PSST post
- Concrete post anchor
- Flat sheet fluorescent signs
- Barrier end modifications
- Excavation and preparation of roadbed
- County road type 1 aggregate for base
- Bituminous pavement mixture PG64-22 base
REQUIRED ATTACHMENTS
6- Contractor Prequalification Questionnaire
- Bid Guaranty
- Subcontractor Disclosure Form
- DBE Identification Submittal
- Certification for Federal Jobs
- Signature and Identity of Bidder
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Callaway and Montgomery Counties, Missouri
- Reported agency
- Missouri Department of Transportation
Questions about this BID
How do I respond to this Bid from Missouri Department of Transportation | State of Missouri?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 20, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact State Design Engineer.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Missouri Department of Transportation | State of Missouri in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is State Design Engineer at (573) 751-2876. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Removal of improvements, Shaping slopes, Gravel or crushed stone, Bituminous pavement mixture PG64-22 surface leveling, Asphaltic concrete mixture, Tack coat, Construction signs, Channelizer, Changeable message sign, Mobilization, Preformed thermoplastic pavement marking, White and yellow class 1 pa. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from Missouri Department of Transportation | State of Missouri?
All active and historical solicitations from Missouri Department of Transportation | State of Missouri are tracked and searchable. As a state agency, Missouri Department of Transportation | State of Missouri regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 20, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Prequalification Questionnaire, Bid Guaranty, Subcontractor Disclosure Form, DBE Identification Submittal, Certification for Federal Jobs, Signature and Identity of Bidder. Review the full document from Missouri Department of Transportation | State of Missouri for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Callaway and Montgomery Counties, Missouri. Review the full solicitation for detailed scope requirements.