Missouri Department of Transportation Consulting Services RFP - JKU0114 and JKU0503 Jackson County I-70 2026
- Due
- Sep 16, 2026
- Deadline passed
- Posted
- Aug 26, 2026
- Primary contact
- Ben McCabe
- (888) 275-6636
The 30-second brief
The Missouri Department of Transportation is requesting consulting engineering services for bridge replacement, eastbound lane addition, and pavement preservation along I-70 from Pittman Road to 40 Highway in Jackson County, Job Nos. JKU0114 and JKU0503. The project includes professional land surveying, geotechnical investigations and borings, conceptual and final roadway design, PS&E preparation, bridge design for structures over Sterling and 40 Highway, utility coordination, environmental and historic preservation, and public outreach. The approximate construction cost is $82,266,000 with an anticipated letting schedule of February 2029. Responses are due by September 16, 2026, at 3:00 pm to the Kansas City District Office or via email. Evaluation criteria include Project Understanding & Innovation (25 pts), Past Performance (25 pts), Qualifications of Personnel Assigned (20 pts), General Experience of Firm (10 pts), Familiarity/Capability (10 pts), and Accessibility of Firm & Staff (10 pts).
Project Understanding & Innovation (25 Points Max), Past Performance (25 Points Max), Qualifications of Personnel Assigned (20 Points Max), General Experience of Firm (10 Points Max), Familiarity/Capability (10 Points Max), Accessibility of Firm & Staff (10 Points Max)
Hear what Missouri Department of Transportation | State of Missouri plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Missouri Department of Transportation is requesting consulting engineering services for bridge replacement, eastbound lane addition, and pavement preservation along I-70 from Pittman Road to 40 Highway in Jackson County, Job Nos.
JKU0114 and JKU0503. The project includes professional land surveying, geotechnical investigations and borings, conceptual and final roadway design, PS&E preparation, bridge design for structures over Sterling and 40 Highway, utility coordination, environmental and historic preservation, and public outreach. The approximate construction cost is $82,266,000 with an anticipated letting schedule of February 2029. Responses are due by September 16, 2026, at 3:00 pm to the Kansas City District Office or via email. Evaluation criteria include Project Understanding & Innovation (25 pts), Past Performance (25 pts), Qualifications of Personnel Assigned (20 pts), General Experience of Firm (10 pts), Familiarity/Capability (10 pts), and Accessibility of Firm & Staff (10 pts).
EVALUATION CRITERIA
6- Project Understanding & Innovation (25 Points Max)
- Past Performance (25 Points Max)
- Qualifications of Personnel Assigned (20 Points Max)
- General Experience of Firm (10 Points Max)
- Familiarity/Capability (10 Points Max)
- Accessibility of Firm & Staff (10 Points Max)
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Jackson County, MO
- Reported agency
- Missouri Department of Transportation
Questions about this RFP
How do I respond to this RFP from Missouri Department of Transportation | State of Missouri?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 16, 2026. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Ben McCabe.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Missouri Department of Transportation | State of Missouri in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Ben McCabe at (888) 275-6636. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Project Understanding & Innovation (25 Points Max), Past Performance (25 Points Max), Qualifications of Personnel Assigned (20 Points Max), General Experience of Firm (10 Points Max), Familiarity/Capa..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Missouri Department of Transportation | State of Missouri?
All active and historical solicitations from Missouri Department of Transportation | State of Missouri are tracked and searchable. As a state agency, Missouri Department of Transportation | State of Missouri regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Missouri Department of Transportation | State of Missouri for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Jackson County, MO. Review the full solicitation for detailed scope requirements.