Ministère des Transports et de la Mobilité durable - Reconstruction de 2 ponts d'étagement, A-40 - 7103-26-1101 (2026)
Ministere des Transports et de la Mobilite durableProvincial Agency · Quebec, QC- Due
- Nov 27, 2026
- 10 days left
- Posted
- Oct 21, 2026
- Primary contact
- DG Capitale-Nationale
- (418) 380-2003
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Ministère des Transports et de la Mobilité durable seeks qualified contractors for civil engineering work under dossier 7103-26-1101 for the reconstruction of two overpass bridges, P-14134N and S, located above Jean-Gauvin Road on the Félix-Leclerc Highway (A-40) in Québec.
The project involves complex bridge construction and repair work, requiring ISO 9001 quality management certification for road or rail infrastructure construction and pre-qualification in complex bridge and tunnel construction. The estimated contract value ranges between 25M$ and 50M$. Bids must be submitted by November 27, 2026, at 14:00 at the Québec bid reception room.
- Submit to
- Salle des soumissions de Québec 700, boul. René-Lévesque Est, 2e étage, salle 2.47A Québec QC CAN G1R4Y9 | [email protected]
- Scope location
- Québec, QC
- Reported agency
- Ministère des Transports et de la Mobilité durable
Questions about this BID
How do I respond to this Bid from Ministere des Transports et de la Mobilite durable?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 27, 2026. Submissions should be delivered to: Salle des soumissions de Québec 700, boul. René-Lévesque Est, 2e étage, salle 2.47A Québec QC CAN G1R4Y9 | [email protected]. For questions, contact DG Capitale-Nationale.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Ministere des Transports et de la Mobilite durable in QC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is DG Capitale-Nationale at (418) 380-2003. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
Where can I find more RFPs from Ministere des Transports et de la Mobilite durable?
All active and historical solicitations from Ministere des Transports et de la Mobilite durable are tracked and searchable. As a provincial agency agency, Ministere des Transports et de la Mobilite durable regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 27, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Ministere des Transports et de la Mobilite durable for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Québec, QC. Review the full solicitation for detailed scope requirements.