Maine Department of Transportation - Loaders Seasonal Rental in Region 3 - 030497.15 - 2026
- Due
- Sep 2, 2026
- Deadline passed
- Posted
- Aug 12, 2026
- Contract term
- 3 years
- Primary contact
- George Macdougall
- (207) 624-3410
The 30-second brief
Supply backhoe/loaders and loaders for seasonal or yearly use by the Department without operators, covering WINs 030497.15, 030499.15, 031107.07, and 031162.03 in Region 3, Maine. The contract involves equipment rental on a monthly basis with scheduled preventative maintenance performed on site by the contractor. Equipment specifications require wheeled loaders between 16,000 and 22,000 lbs, minimum 84hp, bucket capacity of 1.8 to 2.2 cubic yards, articulating with four-wheel drive, and no older than three years at initial delivery. Bids are due by September 2, 2026, with contract expiration on December 31, 2029.
Wheeled Loader Equipment Rental (by Month) 16, 000-22, 000 Lbs, Special Work Transportation
Hear what State of Maine plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Supply backhoe/loaders and loaders for seasonal or yearly use by the Department without operators, covering WINs 030497.15, 030499.15, 031107.07, and 031162.03 in Region 3, Maine.
The contract involves equipment rental on a monthly basis with scheduled preventative maintenance performed on site by the contractor. Equipment specifications require wheeled loaders between 16,000 and 22,000 lbs, minimum 84hp, bucket capacity of 1.8 to 2.2 cubic yards, articulating with four-wheel drive, and no older than three years at initial delivery. Bids are due by September 2, 2026, with contract expiration on December 31, 2029.
REQUIRED DELIVERABLES
4- Wheeled Loader Equipment Rental (by Month) 16
- 000-22
- 000 Lbs
- Special Work Transportation
REQUIRED ATTACHMENTS
7- Notice to Contractors
- Acknowledgement of Bid Amendments form
- Appendix A
- Contract Agreement form
- Technical specification sheets
- Vehicle description
- Lessor's certificate
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Duration
- 41 months
- Scope location
- Region 3, Maine
- Reported agency
- Maine Department of Transportation
Questions about this BID
How do I respond to this Bid from State of Maine?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 2, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact George Macdougall.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including State of Maine in ME, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is George Macdougall at (207) 624-3410. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Wheeled Loader Equipment Rental (by Month) 16, 000-22, 000 Lbs, Special Work Transportation. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from State of Maine?
All active and historical solicitations from State of Maine are tracked and searchable. As a state government agency, State of Maine regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 3 years. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Notice to Contractors, Acknowledgement of Bid Amendments form, Appendix A, Contract Agreement form, technical specification sheets, vehicle description, Lessor's certificate. Review the full document from State of Maine for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Region 3, Maine. Review the full solicitation for detailed scope requirements.