KANSAS DEPARTMENT OF TRANSPORTATION - PLAN AND PROFILE OF PROPOSED STATE HIGHWAY K-383, NORTON COUNTY - 383-69 KA-2371-03
- Due
- Nov 19, 2026
- Deadline passed
- Posted
- Nov 16, 2026
The 30-second brief
Plan and profile of proposed state highway for grading, surfacing (asphalt), bridges, seeding, signing & pavement marking along K-383 in Norton County, Kansas (Federal Aid Project No. STP-A237 (103), KDOT Project No. 383-69 KA-2371-03). Work includes 24,067.41 FT (4.558 miles) of roadway construction, bridge replacements (including multiple RCBs and RFBs such as Br. No. 383-69-96.57, 383-69-96.83, 383-69-97.99, 383-69-99.09, 383-69-99.39, 383-69-99.47, 383-69-100.13, 383-69-100.14, 383-69-100.18), culverts, earthwork, subgrade modification, HMA surfacing, shoulder rumble strips, guardrail, and pavement markings. Approved by State Transportation Engineer on 2026-11-16.
Grading and Surfacing (Asphalt), Bridges, Seeding, Signing & Pavement Marking
Price, experience, approach, references
Hear what Kansas Department of Transportation | State of Kansas plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Plan and profile of proposed state highway for grading, surfacing (asphalt), bridges, seeding, signing & pavement marking along K-383 in Norton County, Kansas (Federal Aid Project No.
STP-A237 (103), KDOT Project No. 383-69 KA-2371-03). Work includes 24,067.41 FT (4.558 miles) of roadway construction, bridge replacements (including multiple RCBs and RFBs such as Br. No. 383-69-96.57, 383-69-96.83, 383-69-97.99, 383-69-99.09, 383-69-99.39, 383-69-99.47, 383-69-100.13, 383-69-100.14, 383-69-100.18), culverts, earthwork, subgrade modification, HMA surfacing, shoulder rumble strips, guardrail, and pavement markings. Approved by State Transportation Engineer on 2026-11-16.
EVALUATION CRITERIA
4- Price
- Experience
- Approach
- References
REQUIRED DELIVERABLES
4- Grading and Surfacing (Asphalt)
- Bridges
- Seeding
- Signing & Pavement Marking
REQUIRED ATTACHMENTS
3- Signed addenda
- Bid bond
- Insurance certificate
- Scope location
- Norton County, Kansas
- Reported agency
- Kansas Department of Transportation
Questions about this BID
How do I respond to this Bid from Kansas Department of Transportation | State of Kansas?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 19, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Kansas Department of Transportation | State of Kansas in KS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Grading and Surfacing (Asphalt), Bridges, Seeding, Signing & Pavement Marking. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price, experience, approach, references" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Kansas Department of Transportation | State of Kansas?
All active and historical solicitations from Kansas Department of Transportation | State of Kansas are tracked and searchable. As a state agency, Kansas Department of Transportation | State of Kansas regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: signed addenda, bid bond, insurance certificate. Review the full document from Kansas Department of Transportation | State of Kansas for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Norton County, Kansas. Review the full solicitation for detailed scope requirements.