The 30-second brief
The Kansas Department of Transportation is seeking prequalified contractors for the construction of pedestrian and bicycle paths spanning 0.9 miles in Herington, Dickinson County, Kansas. The scope of work includes clearing and grubbing, excavation, embankment compaction, sidewalk construction (4" and 6"), sidewalk ramps, storm sewer installation, trench drains, permanent bollards, concrete parking blocks, mailbox installation, seeding, erosion control, concrete surfacing, HMA patching, chain link and temporary construction fencing, signing, and thermoplastic pavement marking, along with flashing beacon systems. Bids are submitted electronically via Bid Express with a letting date of December 16, 2026. Contractors must adhere to federal-aid contract requirements, prevailing wage rates for Dickinson County, and maintain a valid Kansas Department of Revenue Tax Clearance Certificate.
MOBILIZATION; CONTRACTOR CONSTRUCTION STAKING; REMOVAL OF EXISTING STRUCTURES; FOUNDATION STABILIZATION; TRAFFIC CONTROL; FLAGGER; CLEARING AND GRUBBING; SALVAGED TOPSOIL; COMMON EXCAVATION (URB); ROCK EXCAVATION; COMPACTION OF EARTHWORK; WATER (GRADING); ADJUSTMENT OF EXISTING STRUCTURES; SIDEWALK CONSTRUCTION ( 4"); SIDEWALK CONSTRUCTION ( 6"); SIDEWALK RAMP; TEMPORARY SURFACING MATERIAL (AGGREGATE); CROSS ROAD PIPE ( 15"); STORM SEWER (24"); END SECTION ( 15"); INLET (TYPE 22 CURB); FLOWABLE FILL (HIGH STRENGTH); TRENCH DRAIN; BOLLARD (PERMANENT); CONCRETE PARKING BLOCK; MAILBOX INSTALLATION; TEMPORARY FERTILIZER (15-30-15); SOIL EROSION MIX; EROSION CONTROL (CLASS 1) (TYPE C); SEDIMENT REMOVAL; TEMPORARY BERM; TEMPORARY INLET SEDIMENT BARRIER; GEOTEXTILE (EROSION CONTROL); SILT FENCE; SWPPP DESIGN; SWPPP INSPECTION; WATER POLLUTION CONTROL MANAGER; WATER (EROSION CONTROL); WATER (AGGREGATE BASE); AGGREGATE BASE (AB-3) ( 6"); CURB AND GUTTER, COMBINED (AE); CONCRETE PAVEMENT ( 6" UNIFORM); MATERIAL FOR HMA PATCHING; FENCE (CHAIN LINK) ( 6'-0") (SPECIAL); FENCE (CONSTRUCTION) (TEMPORARY); SIGN (FLAT SHEET) (HIGH PERFORMANCE); SIGN POST (2" PERFORATED SQUARE STEEL TUBE); SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE); SIGN (REMOVE AND RESET); PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 4"); PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24"); PAVEMENT MARKING REMOVAL; FLASHING BEACON SYSTEM; SEEDING
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Kansas Department of Transportation is seeking prequalified contractors for the construction of pedestrian and bicycle paths spanning 0.9 miles in Herington, Dickinson County, Kansas.
The scope of work includes clearing and grubbing, excavation, embankment compaction, sidewalk construction (4" and 6"), sidewalk ramps, storm sewer installation, trench drains, permanent bollards, concrete parking blocks, mailbox installation, seeding, erosion control, concrete surfacing, HMA patching, chain link and temporary construction fencing, signing, and thermoplastic pavement marking, along with flashing beacon systems. Bids are submitted electronically via Bid Express with a letting date of December 16, 2026. Contractors must adhere to federal-aid contract requirements, prevailing wage rates for Dickinson County, and maintain a valid Kansas Department of Revenue Tax Clearance Certificate.
REQUIRED DELIVERABLES
54- MOBILIZATION
- CONTRACTOR CONSTRUCTION STAKING
- REMOVAL OF EXISTING STRUCTURES
- FOUNDATION STABILIZATION
- TRAFFIC CONTROL
- FLAGGER
- CLEARING AND GRUBBING
- SALVAGED TOPSOIL
- COMMON EXCAVATION (URB)
- ROCK EXCAVATION
- COMPACTION OF EARTHWORK
- WATER (GRADING)
- ADJUSTMENT OF EXISTING STRUCTURES
- SIDEWALK CONSTRUCTION ( 4")
- SIDEWALK CONSTRUCTION ( 6")
- SIDEWALK RAMP
- TEMPORARY SURFACING MATERIAL (AGGREGATE)
- CROSS ROAD PIPE ( 15")
- STORM SEWER (24")
- END SECTION ( 15")
- INLET (TYPE 22 CURB)
- FLOWABLE FILL (HIGH STRENGTH)
- TRENCH DRAIN
- BOLLARD (PERMANENT)
- CONCRETE PARKING BLOCK
- MAILBOX INSTALLATION
- TEMPORARY FERTILIZER (15-30-15)
- SOIL EROSION MIX
- EROSION CONTROL (CLASS 1) (TYPE C)
- SEDIMENT REMOVAL
- TEMPORARY BERM
- TEMPORARY INLET SEDIMENT BARRIER
- GEOTEXTILE (EROSION CONTROL)
- SILT FENCE
- SWPPP DESIGN
- SWPPP INSPECTION
- WATER POLLUTION CONTROL MANAGER
- WATER (EROSION CONTROL)
- WATER (AGGREGATE BASE)
- AGGREGATE BASE (AB-3) ( 6")
- CURB AND GUTTER, COMBINED (AE)
- CONCRETE PAVEMENT ( 6" UNIFORM)
- MATERIAL FOR HMA PATCHING
- FENCE (CHAIN LINK) ( 6'-0") (SPECIAL)
- FENCE (CONSTRUCTION) (TEMPORARY)
- SIGN (FLAT SHEET) (HIGH PERFORMANCE)
- SIGN POST (2" PERFORATED SQUARE STEEL TUBE)
- SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE)
- SIGN (REMOVE AND RESET)
- PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 4")
- PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
- PAVEMENT MARKING REMOVAL
- FLASHING BEACON SYSTEM
- SEEDING
REQUIRED ATTACHMENTS
Certification-Noncollusion & History of Debarment, Certification-Financial Prequalification Amount, Declaration-Limitations on Use of Federal Funds for Lobbying, Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm, Certification of Company Not Currently Engaged in the Procurement or Use of Prohibited Foreign Unmanned Aerial Systems, Tax Clearance Certificate, Bid Bond
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Herington, Kansas
- Reported agency
- Kansas Department of Transportation
Questions about this BID
How do I respond to this Bid from Kansas Department of Transportation | State of Kansas?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 16, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Kansas Department of Transportation | State of Kansas in KS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: MOBILIZATION; CONTRACTOR CONSTRUCTION STAKING; REMOVAL OF EXISTING STRUCTURES; FOUNDATION STABILIZATION; TRAFFIC CONTROL; FLAGGER; CLEARING AND GRUBBING; SALVAGED TOPSOIL; COMMON EXCAVATION (URB); ROCK EXCAVATION; COMPACTION OF EARTHWORK; WATER (GRADING); ADJUSTMENT OF EXISTING STRUCTURES; SIDEWALK. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
Where can I find more RFPs from Kansas Department of Transportation | State of Kansas?
All active and historical solicitations from Kansas Department of Transportation | State of Kansas are tracked and searchable. As a state agency, Kansas Department of Transportation | State of Kansas regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 80 months. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 16, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Certification-Noncollusion & History of Debarment, Certification-Financial Prequalification Amount, Declaration-Limitations on Use of Federal Funds for Lobbying, Certification-Contractual Services wit. Review the full document from Kansas Department of Transportation | State of Kansas for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Herington, Kansas. Review the full solicitation for detailed scope requirements.