Kansas Department of Transportation Milling and HMA Overlay Project U400-103 KA 8045-01, Wilson County 2026
- Due
- Dec 16, 2026
- 24 days left
- Posted
- Nov 17, 2026
- Duration
- 4 months
- Primary contact
- Chief Of Construction And Materials
- (785) 296-3576
The 30-second brief
The Kansas Department of Transportation is seeking prequalified contractors for construction, improvement, reconstruction, or maintenance work on US-400 in Wilson County, Kansas. The project scope includes milling and hot mix asphalt (HMA) overlay from the Greenwood/Wilson County line south to 0.08 miles north of the Fredonia roundabout, with a total length of 12.00 miles. Key work items involve PCCP patching, HMA surface and overlay mixtures, emulsified asphalt, asphalt density and air void adjustments, pavement edge wedges, milled rumble strips, and multi-component pavement markings. The contract requires 90 restricted days and 110 total working days, with an earliest start date of May 1, 2027 and a latest start date of June 7, 2027. Electronic internet proposals will be accepted via Bid Express (bidx.com) until 1:00 P.M. Local Time on the letting date of December 16, 2026. Proposals will be publicly opened and read at 3:00 P.M. Local Time at the Eisenhower State Office Building in Topeka, Kansas, with remote listening available via conference call.
Milling and HMA overlay, PCCP patching (full depth), Emulsified asphalt, Asphalt leveling courses, Pavement edge wedge (rock), Milled rumble strips (asphalt centerline and shoulder), Multi-component pavement markings (white and yellow), Pavement marking removal
Price
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Kansas Department of Transportation is seeking prequalified contractors for construction, improvement, reconstruction, or maintenance work on US-400 in Wilson County, Kansas.
The project scope includes milling and hot mix asphalt (HMA) overlay from the Greenwood/Wilson County line south to 0.08 miles north of the Fredonia roundabout, with a total length of 12.00 miles. Key work items involve PCCP patching, HMA surface and overlay mixtures, emulsified asphalt, asphalt density and air void adjustments, pavement edge wedges, milled rumble strips, and multi-component pavement markings. The contract requires 90 restricted days and 110 total working days, with an earliest start date of May 1, 2027 and a latest start date of June 7, 2027. Electronic internet proposals will be accepted via Bid Express (bidx.com) until 1:00 P.M. Local Time on the letting date of December 16, 2026. Proposals will be publicly opened and read at 3:00 P.M. Local Time at the Eisenhower State Office Building in Topeka, Kansas, with remote listening available via conference call.
EVALUATION CRITERIA
Price
REQUIRED DELIVERABLES
8- Milling and HMA overlay
- PCCP patching (full depth)
- Emulsified asphalt
- Asphalt leveling courses
- Pavement edge wedge (rock)
- Milled rumble strips (asphalt centerline and shoulder)
- Multi-component pavement markings (white and yellow)
- Pavement marking removal
REQUIRED ATTACHMENTS
Bid bond, DOT Form 202, Required Contract Provisions I through XVII (noncollusion and history of debarment, financial prequalification amount, limitations on use of federal funds for lobbying, contractual services with a current legislator, fuel and asphalt price adjustments, foreign drone restrictions, tax clearance certificate)
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Wilson County, KS
- Reported agency
- Kansas Department of Transportation
Questions about this BID
How do I respond to this Bid from Kansas Department of Transportation | State of Kansas?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 16, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Chief Of Construction And Materials.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Kansas Department of Transportation | State of Kansas in KS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Chief Of Construction And Materials at (785) 296-3576. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Milling and HMA overlay, PCCP patching (full depth), Emulsified asphalt, Asphalt leveling courses, Pavement edge wedge (rock), Milled rumble strips (asphalt centerline and shoulder), Multi-component pavement markings (white and yellow), Pavement marking removal. Proposals should clearly address how each deliverable will be met.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Kansas Department of Transportation | State of Kansas?
All active and historical solicitations from Kansas Department of Transportation | State of Kansas are tracked and searchable. As a state agency, Kansas Department of Transportation | State of Kansas regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 4 months. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 16, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid bond, DOT Form 202, Required Contract Provisions I through XVII (noncollusion and history of debarment, financial prequalification amount, limitations on use of federal funds for lobbying, contrac. Review the full document from Kansas Department of Transportation | State of Kansas for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Wilson County, KS. Review the full solicitation for detailed scope requirements.