BIDCLOSED
Save

Kansas Department of Transportation K232-053 KA 6816-01 Grading, Bridge and Surfacing Bid - Lincoln County

Kansas Department of Transportation | State of Kansas logoKansas Department of Transportation | State of Kansas
Due
Nov 18, 2026
Deadline passed
Posted
Nov 17, 2026
Primary contact
Josh Matyi
(785) 296-7141

The 30-second brief

What they're buying

The Kansas Department of Transportation is issuing Addendum #1 for project K232-053 KA 6816-01 in Lincoln County, involving grading, bridge construction, and surfacing. This project notice updates quantities for rock excavation and end sections, and adds cross road pipe (30") (CSP) and temporary stream crossings. Bids are submitted for contract no. 526112212, associated with the November 18, 2026 letting. Vendors must email the signed notice back to KDOT at [email protected] even if not bidding.

What you must deliver

CONTRACTOR CONSTRUCTION STAKING, FIELD OFFICE AND LABORATORY (TYPE A), MOBILIZATION, REMOVAL OF EXISTING STRUCTURES, MAINTENANCE AND RESTORATION OF HAUL ROADS, CONCRETE FOR SEAL COURSE, FOUNDATION STABILIZATION, CURING ENVIRONMENT, FLAGGER, CLEANING EXISTING STRUCTURE, CLEARING AND GRUBBING, COMMON EXCAVATION, ROCK EXCAVATION, WATER (GRADING), COMPACTION OF EARTHWORK, SALVAGED TOPSOIL, LINER PIPE (30") (HDPE), END SECTION (30"), GUARDRAIL, GUARDRAIL END TERMINAL, CONCRETE DITCH LINING, AGGREGATE DITCH LINING, FLUME INLET (CONCRETE), MOWING, RIGHT-OF-WAY SURVEY MONUMENT, CROSS ROAD PIPE (30") (CSP), TEMPORARY FERTILIZER, SOIL EROSION MIX, EROSION CONTROL, SEDIMENT REMOVAL, TEMPORARY BERM, TEMPORARY DITCH CHECK, TEMPORARY SLOPE DRAIN, FILTER SOCK, GEOTEXTILE (EROSION CONTROL), SILT FENCE, SWPPP DESIGN, SWPPP INSPECTION, WATER POLLUTION CONTROL MANAGER, TEMPORARY STREAM CROSSING, EXCAVATION, CONCRETE (GRADE 4.0), REINFORCING STEEL, STRUCTURAL STEEL, WELDED STUD SHEAR CONNECTORS, PILES (STEEL), TEST PILES (SPECIAL), BEARING (STEEL REINFORCED ELASTOMERIC), BRIDGE BACKWALL PROTECTION SYSTEM, ABUTMENT AGGREGATE DRAIN, SLOPE PROTECTION (RIPRAP STONE), BEDDING FOR SLOPE PROTECTION, BRIDGE DECK GROOVING, TEMPORARY SHORING, CONCRETE PAVEMENT, BRIDGE APPROACH SLAB FOOTING, HMA-COMMERCIAL GRADE (CLASS A), PAVEMENT EDGE WEDGE (ROCK), SIGN (FLAT SHEET), SIGN POST, SIGNING OBJECT MARKER, PAVEMENT MARKING, PAVEMENT MARKING REMOVAL, WORK ZONE SIGNS, WORK ZONE BARRICADES, CHANNELIZER, WORK ZONE WARNING LIGHT, RIGID RAISED PAVEMENT MARKER, TRAFFIC SIGNAL INSTALLATION (TEMPORARY), TRAFFIC CONTROL (INITIAL SETUP), IMPACT ATTENUATOR (TL-3) (TEMPORARY), REPLACEMENT MODULES (IMPACT ATTENUATOR), CONCRETE SAFETY BARRIER

Hear what Kansas Department of Transportation | State of Kansas plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The Kansas Department of Transportation is issuing Addendum #1 for project K232-053 KA 6816-01 in Lincoln County, involving grading, bridge construction, and surfacing.

This project notice updates quantities for rock excavation and end sections, and adds cross road pipe (30") (CSP) and temporary stream crossings. Bids are submitted for contract no. 526112212, associated with the November 18, 2026 letting. Vendors must email the signed notice back to KDOT at [email protected] even if not bidding.

REQUIRED DELIVERABLES

73
  • CONTRACTOR CONSTRUCTION STAKING
  • FIELD OFFICE AND LABORATORY (TYPE A)
  • MOBILIZATION
  • REMOVAL OF EXISTING STRUCTURES
  • MAINTENANCE AND RESTORATION OF HAUL ROADS
  • CONCRETE FOR SEAL COURSE
  • FOUNDATION STABILIZATION
  • CURING ENVIRONMENT
  • FLAGGER
  • CLEANING EXISTING STRUCTURE
  • CLEARING AND GRUBBING
  • COMMON EXCAVATION
  • ROCK EXCAVATION
  • WATER (GRADING)
  • COMPACTION OF EARTHWORK
  • SALVAGED TOPSOIL
  • LINER PIPE (30") (HDPE)
  • END SECTION (30")
  • GUARDRAIL
  • GUARDRAIL END TERMINAL
  • CONCRETE DITCH LINING
  • AGGREGATE DITCH LINING
  • FLUME INLET (CONCRETE)
  • MOWING
  • RIGHT-OF-WAY SURVEY MONUMENT
  • CROSS ROAD PIPE (30") (CSP)
  • TEMPORARY FERTILIZER
  • SOIL EROSION MIX
  • EROSION CONTROL
  • SEDIMENT REMOVAL
  • TEMPORARY BERM
  • TEMPORARY DITCH CHECK
  • TEMPORARY SLOPE DRAIN
  • FILTER SOCK
  • GEOTEXTILE (EROSION CONTROL)
  • SILT FENCE
  • SWPPP DESIGN
  • SWPPP INSPECTION
  • WATER POLLUTION CONTROL MANAGER
  • TEMPORARY STREAM CROSSING
  • EXCAVATION
  • CONCRETE (GRADE 4.0)
  • REINFORCING STEEL
  • STRUCTURAL STEEL
  • WELDED STUD SHEAR CONNECTORS
  • PILES (STEEL)
  • TEST PILES (SPECIAL)
  • BEARING (STEEL REINFORCED ELASTOMERIC)
  • BRIDGE BACKWALL PROTECTION SYSTEM
  • ABUTMENT AGGREGATE DRAIN
  • SLOPE PROTECTION (RIPRAP STONE)
  • BEDDING FOR SLOPE PROTECTION
  • BRIDGE DECK GROOVING
  • TEMPORARY SHORING
  • CONCRETE PAVEMENT
  • BRIDGE APPROACH SLAB FOOTING
  • HMA-COMMERCIAL GRADE (CLASS A)
  • PAVEMENT EDGE WEDGE (ROCK)
  • SIGN (FLAT SHEET)
  • SIGN POST
  • SIGNING OBJECT MARKER
  • PAVEMENT MARKING
  • PAVEMENT MARKING REMOVAL
  • WORK ZONE SIGNS
  • WORK ZONE BARRICADES
  • CHANNELIZER
  • WORK ZONE WARNING LIGHT
  • RIGID RAISED PAVEMENT MARKER
  • TRAFFIC SIGNAL INSTALLATION (TEMPORARY)
  • TRAFFIC CONTROL (INITIAL SETUP)
  • IMPACT ATTENUATOR (TL-3) (TEMPORARY)
  • REPLACEMENT MODULES (IMPACT ATTENUATOR)
  • CONCRETE SAFETY BARRIER

REQUIRED ATTACHMENTS

signed project notice, bid form amendment

Submit to
Online portal, shown to Civic IQ members.Sign up free to see it
Scope location
Lincoln County, KS
Reported agency
Kansas Department of Transportation

Questions about this BID

How do I respond to this Bid from Kansas Department of Transportation | State of Kansas?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Josh Matyi.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Kansas Department of Transportation | State of Kansas in KS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Josh Matyi at (785) 296-7141. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: CONTRACTOR CONSTRUCTION STAKING, FIELD OFFICE AND LABORATORY (TYPE A), MOBILIZATION, REMOVAL OF EXISTING STRUCTURES, MAINTENANCE AND RESTORATION OF HAUL ROADS, CONCRETE FOR SEAL COURSE, FOUNDATION STABILIZATION, CURING ENVIRONMENT, FLAGGER, CLEANING EXISTING STRUCTURE, CLEARING AND GRUBBING, COMMON. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from Kansas Department of Transportation | State of Kansas?

All active and historical solicitations from Kansas Department of Transportation | State of Kansas are tracked and searchable. As a state agency, Kansas Department of Transportation | State of Kansas regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: signed project notice, bid form amendment. Review the full document from Kansas Department of Transportation | State of Kansas for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Lincoln County, KS. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

The coverage behind every signal

agencies covered
275,000+agencies covered
buying signals a week
400,000+buying signals a week
decision makers
2.6M+decision makers
in government spend tracked
$14T+in government spend tracked

Trusted by 200+ enterprise teams

Motive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logo

Start finding government buyers today.

Signals from 275,000+ state, local and education agencies, months before the RFP. Free to start.

No credit card required