Joint School District No. 171 CTE Storage Facility Concrete Foundation & Metal Building Erection RFQ 2026-CTE-01
Orofino Joint School District 171School · Orofino, ID- Due
- Sep 10, 2026
- Deadline passed
- Posted
- Aug 20, 2026
- Primary contact
- Jason Hunter
The 30-second brief
Joint School District No. 171 is requesting quotes for the concrete foundation work and complete erection of a pre-engineered metal building for the Orofino Junior Senior High School (OJSHS) CTE Storage Facility. Part A includes fine grading, continuous sidewall and endwall footings, a 5-inch concrete slab (2,500 psi), and a 4-inch perforated perimeter foundation drain system. Part B covers the erection of primary frames, secondary framing (purlins, girts), X-bracing, wall openings, and R-Panel 26G roof and wall sheeting. The project has a combined budget target under $100,000. Bidders must provide lump-sum pricing, a proposed schedule, and proof of insurance and bonding capacity. A site visit to 300 Dunlap Road, Orofino, ID is recommended. Quotes are due by September 10, 2026.
Lump-sum pricing for Part A and Part B, Itemized foundation drain cost, Itemized allowance for post-installed anchors, Proposed schedule, Idaho Public Works Contractor License, Performance and payment bonds, Insurance certificates, List of three references, Confirmation of site visit
Total price, References, Relevant experience, Availability to start, Bonding capacity and license classification, Completeness and clarity of quote
Hear what Orofino Joint School District 171 plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Joint School District No. 171 is requesting quotes for the concrete foundation work and complete erection of a pre-engineered metal building for the Orofino Junior Senior High School (OJSHS) CTE Storage Facility.
Part A includes fine grading, continuous sidewall and endwall footings, a 5-inch concrete slab (2,500 psi), and a 4-inch perforated perimeter foundation drain system. Part B covers the erection of primary frames, secondary framing (purlins, girts), X-bracing, wall openings, and R-Panel 26G roof and wall sheeting. The project has a combined budget target under $100,000. Bidders must provide lump-sum pricing, a proposed schedule, and proof of insurance and bonding capacity. A site visit to 300 Dunlap Road, Orofino, ID is recommended. Quotes are due by September 10, 2026.
EVALUATION CRITERIA
6- Total price
- References
- Relevant experience
- Availability to start
- Bonding capacity and license classification
- Completeness and clarity of quote
REQUIRED DELIVERABLES
9- Lump-sum pricing for Part A and Part B
- Itemized foundation drain cost
- Itemized allowance for post-installed anchors
- Proposed schedule
- Idaho Public Works Contractor License
- Performance and payment bonds
- Insurance certificates
- List of three references
- Confirmation of site visit
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Orofino, ID
- Projected sq ft
- 2,520 sq ft
- Reported agency
- Joint School District No. 171
Questions about this RFQ
How do I respond to this RFQ from Orofino Joint School District 171?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 10, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Jason Hunter.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Orofino Joint School District 171 in ID, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Jason Hunter. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Lump-sum pricing for Part A and Part B, Itemized foundation drain cost, Itemized allowance for post-installed anchors, Proposed schedule, Idaho Public Works Contractor License, Performance and payment bonds, Insurance certificates, List of three references, Confirmation of site visit. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Total price, References, Relevant experience, Availability to start, Bonding capacity and license classification, Completeness and clarity of quote" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Orofino Joint School District 171?
All active and historical solicitations from Orofino Joint School District 171 are tracked and searchable. As a school agency, Orofino Joint School District 171 regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Orofino Joint School District 171 for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Orofino, ID. The total projected area is 2520 sq ft. Review the full solicitation for detailed scope requirements.