JEA B52-B53 Final Transition Duct Liner System Replacement Bid 2026
- Due
- Sep 15, 2026
- Deadline passed
- Primary contact
- Jason Behr
- (904) 665-6740
Hear about the next one before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Jacksonville Electric Authority (JEA) is soliciting bids for the B52-B53 Final Transition Duct Liner System Replacement project.
The scope of work includes providing engineering, design, fabrication, and installation of sections G, H, and J of the transition duct liners for two gas turbine units located in Duval, FL. A mandatory pre-response meeting was held via Teams or teleconference on August 24 at 11:00 AM EST. Bids must be submitted to 21 W Church St, Jacksonville, FL, 32202 by the deadline of September 15, 2026, at 12:00 PM. Interested parties should contact Jason Behr at 904-665-6740 for further information.
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Duval, FL
Questions about this BID
How do I respond to this Bid from Jacksonville Electric Authority (JEA)?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 15, 2026. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Jason Behr.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Jacksonville Electric Authority (JEA) in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Jason Behr at (904) 665-6740. Questions and answers are typically shared with all prospective bidders.
Show 2 more questions
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Jacksonville Electric Authority (JEA) for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Duval, FL. Review the full solicitation for detailed scope requirements.