Illinois Department of Transportation - IL 4/15 over the Kaskaskia River Bridge Replacement - 76N42 (2026)
State of IllinoisState Government · Springfield, IL- Due
- Mar 5, 2026
- Deadline passed
- Posted
- Feb 10, 2026
- Primary contact
- Michael Stirk
The 30-second brief
The Illinois Department of Transportation is seeking Statements of Qualifications (SOQs) from qualified construction teams for the IL 4/15 over the Kaskaskia River Bridge Replacement Project under Contract No. 76N42 using a Construction Manager/General Contractor (CMGC) delivery method. The project involves the removal and replacement of three bridges located east of Fayetteville in St. Clair County: the main bridge over the Kaskaskia River (SN 082-0077) and two bridges over the Kaskaskia River overflow channels (SN 082-0078, SN 082-0275), along with roadway improvements, construction of sidewalks, and a 10-foot shared-use path. The work includes earthwork, Portland cement concrete and HMA paving, aggregate bases, structural steel/concrete bridge construction, drainage, electrical work, landscaping, guardrail, and signing. Responses are due by March 5, 2026, at 4:00 PM Central Time, and a surety letter in the amount of $87,000,000 is required with the SOQ.
Qualifications of Team (45 Points), Proposer Experience (30 Points), Understanding of Alternative Delivery Process (25 Points)
Hear what State of Illinois plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Illinois Department of Transportation is seeking Statements of Qualifications (SOQs) from qualified construction teams for the IL 4/15 over the Kaskaskia River Bridge Replacement Project under Contract No. 76N42 using a Construction Manager/General Contractor (CMGC) delivery method.
The project involves the removal and replacement of three bridges located east of Fayetteville in St. Clair County: the main bridge over the Kaskaskia River (SN 082-0077) and two bridges over the Kaskaskia River overflow channels (SN 082-0078, SN 082-0275), along with roadway improvements, construction of sidewalks, and a 10-foot shared-use path. The work includes earthwork, Portland cement concrete and HMA paving, aggregate bases, structural steel/concrete bridge construction, drainage, electrical work, landscaping, guardrail, and signing. Responses are due by March 5, 2026, at 4:00 PM Central Time, and a surety letter in the amount of $87,000,000 is required with the SOQ.
EVALUATION CRITERIA
REQUIRED ATTACHMENTS
Form 1 - Statement of Qualifications Checklist and Contents, Form 2 - Affiliated and Subsidiary Companies of the Proposer, Form 3 - Certification Regarding Debarment Primary Covered Transactions, Surety Letter, Form 4 - Proposer Licenses and Registrations, Form 5 - Acknowledgement of RFQ Revision and/or Addenda, Form 6 - Conflict of Interest Disclosure, Affidavit of Availability (BC 57), Copy of Submitted Certificate of Joint Venture (BC 2267), Form 7 - Key Personnel Resume Form, Form 8 - Work History Forms
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- St. Clair County, Illinois
- Reported agency
- Illinois Department of Transportation
Questions about this RFQ
How do I respond to this RFQ from State of Illinois?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is March 5, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Michael Stirk.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including State of Illinois in IL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Michael Stirk. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Qualifications of Team (45 Points), Proposer Experience (30 Points), Understanding of Alternative Delivery Process (25 Points)" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from State of Illinois?
All active and historical solicitations from State of Illinois are tracked and searchable. As a state government agency, State of Illinois regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Form 1 - Statement of Qualifications Checklist and Contents, Form 2 - Affiliated and Subsidiary Companies of the Proposer, Form 3 - Certification Regarding Debarment Primary Covered Transactions, Sure. Review the full document from State of Illinois for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: St. Clair County, Illinois. Review the full solicitation for detailed scope requirements.