Illinois Department of Transportation - IDOT Liquid Bituminous Materials FY27 - 2027-03
State of IllinoisState Government · Springfield, IL- Due
- Jul 2, 2026
- Deadline passed
- Contract term
- 2 years
- Primary contact
- Ashley Murphy
- (217) 782-8414
The 30-second brief
The Illinois Department of Transportation is seeking bids for an indefinite quantity contract of liquid bituminous mixtures across the State of Illinois. The opportunity is a multiple award opportunity whereas contracts will be awarded to all Vendor(s) who submit bids deemed as responsive and responsible. Required materials include liquid bituminous mixtures such as RC-70, CRS-2, SS-1H, and HFE-90/150 in bulk and 5 gallon pails. The resulting contract with awarded bidders shall have an initial term of November 1, 2026 through December 31, 2028, with a maximum total term not to exceed ten years. Bids are due by July 2, 2026 at 1:00 PM CST, and vendor bids must remain firm for 180 days from opening. Questions must be submitted in writing no later than June 25, 2026.
Line Item 1: Asphalt, Liquid, RC-70, RapidA3:A12Curing, 5 Gallon Pails, As Per Section 1032.07 in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Pail: 5 Gallons (Estimated Quantity: 40); Line Item 2: Asphalt, Liquid, RC-70, Rapid Curing As Per Section 1032.07 in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Over 2, 000 Gallons (Estimated Quantity: 40); Line Item 3: Asphalt, CRS-2, Cationic Emulsified, As per Section 1032.06 (B) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 30, 000); Line Item 4: Asphalt, SS-1H, Anionic Emulsified, As per Section 1032.06 (A) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 16, 000); Line Item 5: Asphalt, SS-1H, Anionic Emulsified, 5 Gallon Pails, As per Section 1032.06 (A) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Pail: 5 Gallon (Estimated Quantity: 504); Line Item 6: Asphalt, HFE-90, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 2, 000); Line Item 7: Asphalt, HFE-90, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Over 2, 000 Gallons (Estimated Quantity: 180, 000); Line Item 8: Asphalt, HFE-150, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 55, 500); Line Item 9: Asphalt, HFE-150, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Over 2, 000 Gallons (Estimated Quantity: 190, 000); Line Item 10: Option for Delivery of Bulk Liquid Bituminous Materials Over 2, 000 Gallons to Job Site (Estimated Quantity: 1); Line Item 11: Option for Delivery of Bulk Liquid Bituminous Materials Under 2, 000 Gallons to Job Site (Estimated Quantity: 1)
Lowest price
Hear what State of Illinois plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Illinois Department of Transportation is seeking bids for an indefinite quantity contract of liquid bituminous mixtures across the State of Illinois.
The opportunity is a multiple award opportunity whereas contracts will be awarded to all Vendor(s) who submit bids deemed as responsive and responsible. Required materials include liquid bituminous mixtures such as RC-70, CRS-2, SS-1H, and HFE-90/150 in bulk and 5 gallon pails. The resulting contract with awarded bidders shall have an initial term of November 1, 2026 through December 31, 2028, with a maximum total term not to exceed ten years. Bids are due by July 2, 2026 at 1:00 PM CST, and vendor bids must remain firm for 180 days from opening. Questions must be submitted in writing no later than June 25, 2026.
EVALUATION CRITERIA
Lowest price
REQUIRED DELIVERABLES
Line Item 1: Asphalt, Liquid, RC-70, RapidA3:A12Curing, 5 Gallon Pails, As Per Section 1032.07 in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Pail: 5 Gallons (Estimated Quantity: 40); Line Item 2: Asphalt, Liquid, RC-70, Rapid Curing As Per Section 1032.07 in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Over 2, 000 Gallons (Estimated Quantity: 40); Line Item 3: Asphalt, CRS-2, Cationic Emulsified, As per Section 1032.06 (B) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 30, 000); Line Item 4: Asphalt, SS-1H, Anionic Emulsified, As per Section 1032.06 (A) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 16, 000); Line Item 5: Asphalt, SS-1H, Anionic Emulsified, 5 Gallon Pails, As per Section 1032.06 (A) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Pail: 5 Gallon (Estimated Quantity: 504); Line Item 6: Asphalt, HFE-90, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 2, 000); Line Item 7: Asphalt, HFE-90, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Over 2, 000 Gallons (Estimated Quantity: 180, 000); Line Item 8: Asphalt, HFE-150, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Under 2, 000 Gallons (Estimated Quantity: 55, 500); Line Item 9: Asphalt, HFE-150, High Float, Emulsified, As Per Section 1032.06 (C) in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Bulk: Over 2, 000 Gallons (Estimated Quantity: 190, 000); Line Item 10: Option for Delivery of Bulk Liquid Bituminous Materials Over 2, 000 Gallons to Job Site (Estimated Quantity: 1); Line Item 11: Option for Delivery of Bulk Liquid Bituminous Materials Under 2, 000 Gallons to Job Site (Estimated Quantity: 1)
REQUIRED ATTACHMENTS
Taxpayer Identification Number (ATTACHMENT JJ), Offer (Section 2, Part B), Exceptions to Solicitation Contract Terms and Conditions (ATTACHMENT HH), Authorized to Transact Business or Conduct Affairs in Illinois (ATTACHMENT BB), Illinois Department of Human Rights Public Contract Number (ATTACHMENT CC), Standard Certifications (ATTACHMENT DD), Financial Disclosures and Conflicts of Interest (ATTACHMENT EE), Disclosure of Business Operations in Iran (ATTACHMENT FF), Business Directory Information (ATTACHMENT GG), Proof of Insurance coverage
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Duration
- 26 months
- Scope location
- Springfield, IL
- Reported agency
- Illinois Department of Transportation
Questions about this BID
How do I respond to this Bid from State of Illinois?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is July 2, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Ashley Murphy.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including State of Illinois in IL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Ashley Murphy at (217) 782-8414. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Line Item 1: Asphalt, Liquid, RC-70, RapidA3:A12Curing, 5 Gallon Pails, As Per Section 1032.07 in the Standard Specifications For Road & Bridge Construction - Adopted January 1, 2022, Pail: 5 Gallons (Estimated Quantity: 40); Line Item 2: Asphalt, Liquid, RC-70, Rapid Curing As Per Section 1032.07 i. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from State of Illinois?
All active and historical solicitations from State of Illinois are tracked and searchable. As a state government agency, State of Illinois regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 2 years. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Taxpayer Identification Number (ATTACHMENT JJ), Offer (Section 2, Part B), Exceptions to Solicitation Contract Terms and Conditions (ATTACHMENT HH), Authorized to Transact Business or Conduct Affairs. Review the full document from State of Illinois for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Springfield, IL. Review the full solicitation for detailed scope requirements.