Humboldt Waste Management Authority Cummings Road Landfill Office Repairs RFB 2026
Humboldt Waste Management AuthoritySpecial District · Eureka, CA- Due
- Dec 28, 2026
- 38 days left
- Posted
- Nov 16, 2026
- Contract term
- 0.5 years
- Primary contact
- Eric Keller-Heckman
- (707) 268-8680
The 30-second brief
Humboldt Waste Management Authority invites sealed bids for the Cummings Road Landfill Office Repairs project located at 5595 Cummings Road, Eureka, CA 95503. The work encompasses exterior decking and ledger repairs, framing and siding replacement using Hardi panel and plank, flooring and subfloor repairs, fascia board replacement with Western Red Cedar, priming of new siding and trim, insulation handling, and debris disposal at the Hawthorne Street Transfer Station. Bids are due by December 28, 2026, at 3:00 p.m. Mandatory site visit is scheduled for November 30, 2026, at 1:00 p.m. Written questions are due by December 7, 2026. Contractors must possess a valid State of California Class B or Class C license and DIR registration.
Scope of Work Item # 1, Scope of Work Item # 2, Scope of Work Item # 3, Scope of Work Item # 4, Scope of Work Item # 5, Scope of Work Item # 6, All Other
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Humboldt Waste Management Authority invites sealed bids for the Cummings Road Landfill Office Repairs project located at 5595 Cummings Road, Eureka, CA 95503.
The work encompasses exterior decking and ledger repairs, framing and siding replacement using Hardi panel and plank, flooring and subfloor repairs, fascia board replacement with Western Red Cedar, priming of new siding and trim, insulation handling, and debris disposal at the Hawthorne Street Transfer Station. Bids are due by December 28, 2026, at 3:00 p.m. Mandatory site visit is scheduled for November 30, 2026, at 1:00 p.m. Written questions are due by December 7, 2026. Contractors must possess a valid State of California Class B or Class C license and DIR registration.
REQUIRED DELIVERABLES
7- Scope of Work Item # 1
- Scope of Work Item # 2
- Scope of Work Item # 3
- Scope of Work Item # 4
- Scope of Work Item # 5
- Scope of Work Item # 6
- All Other
REQUIRED ATTACHMENTS
10- Proposal
- Bid Schedule
- Fair Employment Practices Certification
- Worker’s Compensation Certificate
- Certification of Nondiscrimination in Employment
- List of Proposed Subcontractors
- Statement of Experience of Bidder
- Signature of Bidder
- Bidder’s Bond
- Non-Collusion Affidavit
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Eureka, CA
Questions about this BID
How do I respond to this Bid from Humboldt Waste Management Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 28, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Eric Keller-Heckman.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Humboldt Waste Management Authority in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Eric Keller-Heckman at (707) 268-8680. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Scope of Work Item # 1, Scope of Work Item # 2, Scope of Work Item # 3, Scope of Work Item # 4, Scope of Work Item # 5, Scope of Work Item # 6, All Other. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
Where can I find more RFPs from Humboldt Waste Management Authority?
All active and historical solicitations from Humboldt Waste Management Authority are tracked and searchable. As a special district agency, Humboldt Waste Management Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 0.5 years. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 28, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Proposal, Bid Schedule, Fair Employment Practices Certification, Worker’s Compensation Certificate, Certification of Nondiscrimination in Employment, List of Proposed Subcontractors, Statement of Expe. Review the full document from Humboldt Waste Management Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Eureka, CA. Review the full solicitation for detailed scope requirements.