Eagle Mountain City EMC-FY27-12 - EMC Power Corridor Water Main 100% Design & Preliminary Engineering
- Due
- Dec 14, 2026
- 17 days left
- Posted
- Nov 23, 2026
- Primary contact
- Melissa Yates
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Eagle Mountain City is requesting proposals for 100% design and preliminary engineering services for a 12-inch culinary water main approximately 2,600 feet long.
The project connects the existing 24-inch CWP water main in the park strip on Pony Express to the existing water main in Golden Eagle to alleviate low pressures in the Skyline Ridge Subdivision, serve existing and future homes, and enhance system redundancy and fire flow capacity. Submission deadline is December 14, 2026, with questions due by December 4, 2026. Submissions are accepted online via Bonfire or email.
REQUIRED ATTACHMENTS
Insurance verification with bid, Certificate of Insurance at contract signing
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Eagle Mountain, UT
- Reported agency
- Eagle Mountain City
View all Civil, water, coastal & stormwater engineering RFPs →
Questions about this RFP
How do I respond to this RFP from City of Eagle Mountain?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 14, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Melissa Yates.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including City of Eagle Mountain in UT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Melissa Yates. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
Where can I find more RFPs from City of Eagle Mountain?
All active and historical solicitations from City of Eagle Mountain are tracked and searchable. As a city agency, City of Eagle Mountain regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 14, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Insurance verification with bid, Certificate of Insurance at contract signing. Review the full document from City of Eagle Mountain for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Eagle Mountain, UT. Review the full solicitation for detailed scope requirements.