City of Winder Preconstruction Engineering Design Services RFQ 2026-01 - Jackson St. @ SR8 Pedestrian Bridge GDOT PI 0021599
- Due
- Nov 19, 2026
- 1 day left
- Posted
- Oct 12, 2026
- Primary contact
- P.j. Klein
- (678) 425-6843
The 30-second brief
The City of Winder, Georgia is soliciting Statement of Qualifications (SOQs) from qualified engineering firms for Preconstruction Engineering Design Services for the Jackson Street @ SR 8 (May Street) Pedestrian Bridge project, GDOT PI 0021599. The project involves constructing a 10-foot wide pedestrian bridge between S. Jackson Street and North Jackson Street spanning State Route 8, connecting downtown walkways and improving pedestrian safety. The scope encompasses concept development, field surveys, environmental documents, preliminary and final roadway plans, right-of-way plans, utility coordination, subsurface utility engineering (SUE QL-D and QL-B), geotechnical assessments, and bridge design in accordance with GDOT processes. Submissions are due by November 19, 2026, at 2:00 P.M. and must be submitted electronically to P.J. Klein, Assistant City Engineer. Present teams must be prequalified in required GDOT Area Classes including urban roadway design and pedestrian facilities.
Project Manager, Key Team Leader(s) and Prime's Experience, and Qualifications (30%), Project Manager, Key Team Leader(s) and Prime's Resources, and Workload Capacity (20%), Technical Approach (40%), Past Performance (10%)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The City of Winder, Georgia is soliciting Statement of Qualifications (SOQs) from qualified engineering firms for Preconstruction Engineering Design Services for the Jackson Street @ SR 8 (May Street) Pedestrian Bridge project, GDOT PI 0021599.
The project involves constructing a 10-foot wide pedestrian bridge between S. Jackson Street and North Jackson Street spanning State Route 8, connecting downtown walkways and improving pedestrian safety. The scope encompasses concept development, field surveys, environmental documents, preliminary and final roadway plans, right-of-way plans, utility coordination, subsurface utility engineering (SUE QL-D and QL-B), geotechnical assessments, and bridge design in accordance with GDOT processes. Submissions are due by November 19, 2026, at 2:00 P.M. and must be submitted electronically to P.J. Klein, Assistant City Engineer. Present teams must be prequalified in required GDOT Area Classes including urban roadway design and pedestrian facilities.
EVALUATION CRITERIA
REQUIRED ATTACHMENTS
5- Certification Form Exhibit II
- Georgia Security and Immigration Compliance Act Affidavit Exhibit III
- Signed cover page of any Addenda
- Area Class Summary Form Exhibit IV
- Notice of Professional Consultant Qualifications
- Submit to
- [email protected]
- Scope location
- Winder, GA
Questions about this RFQ
How do I respond to this RFQ from City of Winder?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 19, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact P.j. Klein.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including City of Winder in GA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is P.j. Klein at (678) 425-6843. Questions and answers are typically shared with all prospective bidders.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Project Manager, Key Team Leader(s) and Prime's Experience, and Qualifications (30%), Project Manager, Key Team Leader(s) and Prime's Resources, and Workload Capacity (20%), Technical Approach (40%),..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from City of Winder?
All active and historical solicitations from City of Winder are tracked and searchable. As a city agency, City of Winder regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 19, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Certification Form Exhibit II, Georgia Security and Immigration Compliance Act Affidavit Exhibit III, Signed cover page of any Addenda, Area Class Summary Form Exhibit IV, Notice of Professional Consu. Review the full document from City of Winder for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Winder, GA. Review the full solicitation for detailed scope requirements.