City of Pensacola - Pensacola International Airport GPU and PCA Replacement Project, Bid No. 26-XXX, 2026
- Due
- May 27, 2026
- Deadline passed
- Posted
- Apr 27, 2026
The 30-second brief
The City of Pensacola is inviting bids for the replacement of pre-conditioned air (PCA) units and ground power units (GPUs) at Pensacola International Airport in Pensacola, Florida. The scope of work includes the replacement of 10 existing pre-conditioned air units and 9 existing ground power units across existing terminal gates, along with associated electrical upgrades, cabling, breakers, and demolition work under Bid No. 26-XXX. Contractors must coordinate all construction activities with airport operations to ensure continuity of service, comply with FAA safety and security guidelines including AC 150/5370-2G, and meet all local and state regulations.
10 Pre-Conditioned Air Units (45 Ton), 5 Pre-Conditioned Air Units (45 Ton - Not Installed), 3 Ground Power Units (90 kVA - Installed on Existing PBB), 6 Ground Power Units (90 kVA & 28V - Installed on Existing PBB), 2 Ground Power Units (90 kVA - Not Installed), 3 Ground Power Units (90 kVA & 28V - Not Installed), Mobilization
Hear what Pensacola plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The City of Pensacola is inviting bids for the replacement of pre-conditioned air (PCA) units and ground power units (GPUs) at Pensacola International Airport in Pensacola, Florida.
The scope of work includes the replacement of 10 existing pre-conditioned air units and 9 existing ground power units across existing terminal gates, along with associated electrical upgrades, cabling, breakers, and demolition work under Bid No. 26-XXX. Contractors must coordinate all construction activities with airport operations to ensure continuity of service, comply with FAA safety and security guidelines including AC 150/5370-2G, and meet all local and state regulations.
REQUIRED DELIVERABLES
10 Pre-Conditioned Air Units (45 Ton), 5 Pre-Conditioned Air Units (45 Ton - Not Installed), 3 Ground Power Units (90 kVA - Installed on Existing PBB), 6 Ground Power Units (90 kVA & 28V - Installed on Existing PBB), 2 Ground Power Units (90 kVA - Not Installed), 3 Ground Power Units (90 kVA & 28V - Not Installed), Mobilization
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Pensacola, FL
Questions about this BID
How do I respond to this Bid from City of Pensacola?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 27, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions go to a mailing address at the agency; Civic IQ members see the exact address.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Pensacola in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: 10 Pre-Conditioned Air Units (45 Ton), 5 Pre-Conditioned Air Units (45 Ton - Not Installed), 3 Ground Power Units (90 kVA - Installed on Existing PBB), 6 Ground Power Units (90 kVA & 28V - Installed on Existing PBB), 2 Ground Power Units (90 kVA - Not Installed), 3 Ground Power Units (90 kVA & 28V -. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from City of Pensacola?
All active and historical solicitations from City of Pensacola are tracked and searchable. As a city agency, City of Pensacola regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from City of Pensacola for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Pensacola, FL. Review the full solicitation for detailed scope requirements.