City of Fairhope - Fairhope Cast Iron Replacement Phase 3 - Bid No. 27-005-2026-GAS-005 (2026)
- Due
- Dec 10, 2026
- 13 days left
- Posted
- Nov 13, 2026
- Duration
- 250 months
- Primary contact
- Erin Wolfe
- (251) 928-8003
The 30-second brief
The City of Fairhope is requesting bids for the Fairhope Cast Iron Replacement Phase 3 project, Bid No. 27-005-2026-GAS-005. The scope of work includes constructing approximately 38,232 feet of 2" PE and 506 feet of 3/4" PE gas mains, installing new gas 3/4" PE service lines to serve approximately 480 existing gas customers, performing tie-ins, retiring existing mains and service lines in place, and replacing approximately 1,200 water meters with SmartPoint connections. The system is designed to operate at 60 PSIG. Bids are due by 3:00 P.M. on Thursday, December 10, 2026. A mandatory pre-bid meeting is scheduled for Thursday, December 3, 2026, at 2:00 P.M. CST. Questions must be submitted in writing by Monday, December 7, 2026, at 11:00 A.M. A bid security of 5% (up to $10,000) is required.
3/4" PE Service Replacement, 2" PE Main Installation, 3/4" PE Main Installation, PE Valve Installation, Tie-in to Pressurized Main 2", Mobilization for Construction Crews and Equipment, Pre-construction Video Inspection of Sewer Mains, Pre-construction Video Inspection of Sewer Laterals, Post-construction Video Inspection of Sewer Mains, Post-construction Video Inspection of Sewer Laterals, Mobilization for Sewer Cleaning and Video Inspection
Lowest responsible bidder complying with conditions, price, quality, conformity with specifications, delivery dates, financial ability, previous performance
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The City of Fairhope is requesting bids for the Fairhope Cast Iron Replacement Phase 3 project, Bid No. 27-005-2026-GAS-005.
The scope of work includes constructing approximately 38,232 feet of 2" PE and 506 feet of 3/4" PE gas mains, installing new gas 3/4" PE service lines to serve approximately 480 existing gas customers, performing tie-ins, retiring existing mains and service lines in place, and replacing approximately 1,200 water meters with SmartPoint connections. The system is designed to operate at 60 PSIG. Bids are due by 3:00 P.M. on Thursday, December 10, 2026. A mandatory pre-bid meeting is scheduled for Thursday, December 3, 2026, at 2:00 P.M. CST. Questions must be submitted in writing by Monday, December 7, 2026, at 11:00 A.M. A bid security of 5% (up to $10,000) is required.
EVALUATION CRITERIA
7- Lowest responsible bidder complying with conditions
- Price
- Quality
- Conformity with specifications
- Delivery dates
- Financial ability
- Previous performance
REQUIRED DELIVERABLES
11- 3/4" PE Service Replacement
- 2" PE Main Installation
- 3/4" PE Main Installation
- PE Valve Installation
- Tie-in to Pressurized Main 2"
- Mobilization for Construction Crews and Equipment
- Pre-construction Video Inspection of Sewer Mains
- Pre-construction Video Inspection of Sewer Laterals
- Post-construction Video Inspection of Sewer Mains
- Post-construction Video Inspection of Sewer Laterals
- Mobilization for Sewer Cleaning and Video Inspection
REQUIRED ATTACHMENTS
4- Bid Bond
- Contractor Information
- Certificate of Insurance
- Bid Form
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Fairhope, AL
View all Energy & telecom utility construction RFPs →
Questions about this BID
How do I respond to this Bid from City of Fairhope?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 10, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Erin Wolfe.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Fairhope in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Erin Wolfe at (251) 928-8003. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 3/4" PE Service Replacement, 2" PE Main Installation, 3/4" PE Main Installation, PE Valve Installation, Tie-in to Pressurized Main 2", Mobilization for Construction Crews and Equipment, Pre-construction Video Inspection of Sewer Mains, Pre-construction Video Inspection of Sewer Laterals, Post-constr. Proposals should clearly address how each deliverable will be met.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsible bidder complying with conditions, price, quality, conformity with specifications, delivery dates, financial ability, previous performance" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from City of Fairhope?
All active and historical solicitations from City of Fairhope are tracked and searchable. As a city agency, City of Fairhope regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 250 months. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 10, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Bond, Contractor Information, Certificate of Insurance, Bid Form. Review the full document from City of Fairhope for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Fairhope, AL. Review the full solicitation for detailed scope requirements.