California Energy Commission - Siting, Transmission, and Environmental Protection Small Power Plant Exemption Peak Workload RFQ-26-701 (2026)
- Due
- Oct 1, 2026
- Deadline passed
- Posted
- Aug 27, 2026
- Contract term
- 4 years
- Primary contact
- Diana Grady
- (916) 375-4940
The 30-second brief
The California Energy Commission is seeking a prime contractor to provide technical specialists and peak workload support for evaluating Small Power Plant Exemption (SPPE) applications. The work involves environmental impact assessment, CEQA and NEPA analysis, mitigation development, technical report writing and review, GIS analysis, and regulatory compliance for power plants and energy facilities. Services include application completeness review, discovery, analysis, meeting coordination, and siting project management across various disciplines such as air quality, biological resources, cultural resources, geology, hazards, land use, noise, public health, soils, traffic, transmission engineering, water resources, and wildfire. The contract will be a no-fee retainer agreement reimbursed through project applicants, with an estimated duration through June 2031. Submissions are due by October 1, 2026, through the CEC Grant Solicitation System.
Approach to Tasks in Scope of Work (50), Project Team Organizational Structure & Cost Minimization (50), Project Team Relevant Experience and Qualifications (500), Analytical Tools (100), Client References (50), Example of Prior Work (100)
Hear what California Energy Commission plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The California Energy Commission is seeking a prime contractor to provide technical specialists and peak workload support for evaluating Small Power Plant Exemption (SPPE) applications.
The work involves environmental impact assessment, CEQA and NEPA analysis, mitigation development, technical report writing and review, GIS analysis, and regulatory compliance for power plants and energy facilities. Services include application completeness review, discovery, analysis, meeting coordination, and siting project management across various disciplines such as air quality, biological resources, cultural resources, geology, hazards, land use, noise, public health, soils, traffic, transmission engineering, water resources, and wildfire. The contract will be a no-fee retainer agreement reimbursed through project applicants, with an estimated duration through June 2031. Submissions are due by October 1, 2026, through the CEC Grant Solicitation System.
EVALUATION CRITERIA
REQUIRED ATTACHMENTS
5- Contractor Status Form Attachment 1
- Darfur Contracting Act Form Attachment 2
- DVBE Declarations Form Std. 843 Attachment 3
- Bidder Declaration Form GSPD-05-105 Attachment 4
- Contractor Certification Clauses Attachment 5
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Duration
- 53 months
- Scope location
- Sacramento, California
Questions about this RFQ
How do I respond to this RFQ from California Energy Commission?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 1, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Diana Grady.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including California Energy Commission in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Diana Grady at (916) 375-4940. Questions and answers are typically shared with all prospective bidders.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Approach to Tasks in Scope of Work (50), Project Team Organizational Structure & Cost Minimization (50), Project Team Relevant Experience and Qualifications (500), Analytical Tools (100), Client Refer..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from California Energy Commission?
All active and historical solicitations from California Energy Commission are tracked and searchable. As a special district agency, California Energy Commission regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 4 years. Contract terms may include renewal options.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Status Form Attachment 1, Darfur Contracting Act Form Attachment 2, DVBE Declarations Form Std. 843 Attachment 3, Bidder Declaration Form GSPD-05-105 Attachment 4, Contractor Certification. Review the full document from California Energy Commission for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Sacramento, California. Review the full solicitation for detailed scope requirements.