California Energy Commission - National Electric Vehicle Infrastructure Formula Program - Solicitation 6 Community Charging - GFO-25-603, 2026
- Due
- Dec 11, 2026
- 21 days left
- Posted
- Feb 23, 2026
- Contract term
- 5 years
- Primary contact
- Crystal Willis
- (916) 529-1108
The 30-second brief
The California Energy Commission announces a competitive grant solicitation providing up to $79,000,000 in grant funds for the strategic deployment of electric vehicle (EV) charging stations with publicly accessible, high-powered direct current fast chargers (DCFCs) along major alternative fuel corridors under the National Electric Vehicle Infrastructure (NEVI) formula program. Submitted projects must include between 1 and 20 public EV charging stations, with each station featuring a minimum of four and a maximum of 20 network-connected DCFC ports equipped with CCS Type 1 connectors delivering at least 150 kW simultaneously. Projects must be sited within one mile of a highway off-ramp or intersection in previously disturbed or developed areas, operate continuously 24/7 for at least five years, achieve greater than 97 percent annual uptime, and comply with Build America, Buy America requirements, prevailing wage rules, and NEVI cybersecurity standards. The submission deadline is December 11, 2026, via the Energy Commission Agreement Management System (ECAMS). An optional pre-application workshop was held on March 11, 2026, and written questions were accepted through July 27, 2026. Applicants must provide a mandatory 20% match share.
DCFC electric vehicle supply equipment (EVSE) with between 4 and 20 CCS ports per station, Transformers, Electric panels, Conduit, Wiring, Meters, Planning and permitting of on-site renewable DER equipment, Installation costs, Planning and engineering design costs, Lighting and canopies
EV Charging Station Siting and Equipment (10), Project Readiness (30), Expected Project Benefits (10), Project Budget and Finances (30), Operations and Maintenance Plan (10), Team Experience and Qualifications (10)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The California Energy Commission announces a competitive grant solicitation providing up to $79,000,000 in grant funds for the strategic deployment of electric vehicle (EV) charging stations with publicly accessible, high-powered direct current fast chargers (DCFCs) along major alternative fuel corridors under the National Electric Vehicle Infrastructure (NEVI) formula program.
Submitted projects must include between 1 and 20 public EV charging stations, with each station featuring a minimum of four and a maximum of 20 network-connected DCFC ports equipped with CCS Type 1 connectors delivering at least 150 kW simultaneously. Projects must be sited within one mile of a highway off-ramp or intersection in previously disturbed or developed areas, operate continuously 24/7 for at least five years, achieve greater than 97 percent annual uptime, and comply with Build America, Buy America requirements, prevailing wage rules, and NEVI cybersecurity standards. The submission deadline is December 11, 2026, via the Energy Commission Agreement Management System (ECAMS). An optional pre-application workshop was held on March 11, 2026, and written questions were accepted through July 27, 2026. Applicants must provide a mandatory 20% match share.
EVALUATION CRITERIA
REQUIRED DELIVERABLES
DCFC electric vehicle supply equipment (EVSE) with between 4 and 20 CCS ports per station, Transformers, Electric panels, Conduit, Wiring, Meters, Planning and permitting of on-site renewable DER equipment, Installation costs, Planning and engineering design costs, Lighting and canopies
REQUIRED ATTACHMENTS
Project Narrative (Attachment 1), Station Information (Attachment 1B), Schedule of Products and Due Dates (Attachment 2), Proposal Budget (Attachment 3), Letters of Commitment (Attachment 4), Preliminary Site Plan (Attachment 5), CEQA Worksheet (Attachment 6), National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form (Attachment 7), Utility Verification Form (Attachment 8), Resumes (Attachment 9), Contact List (Attachment 10), Past Performance Reference Form(s) (Attachment 11), Applicant Declaration (Attachment 12)
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Duration
- 60 months
- Scope location
- Sacramento, California
Questions about this RFP
How do I respond to this RFP from California Energy Commission?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 11, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Crystal Willis.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including California Energy Commission in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Crystal Willis at (916) 529-1108. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: DCFC electric vehicle supply equipment (EVSE) with between 4 and 20 CCS ports per station, Transformers, Electric panels, Conduit, Wiring, Meters, Planning and permitting of on-site renewable DER equipment, Installation costs, Planning and engineering design costs, Lighting and canopies. Proposals should clearly address how each deliverable will be met.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "EV Charging Station Siting and Equipment (10), Project Readiness (30), Expected Project Benefits (10), Project Budget and Finances (30), Operations and Maintenance Plan (10), Team Experience and Quali..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from California Energy Commission?
All active and historical solicitations from California Energy Commission are tracked and searchable. As a special district agency, California Energy Commission regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 5 years. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 11, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Project Narrative (Attachment 1), Station Information (Attachment 1B), Schedule of Products and Due Dates (Attachment 2), Proposal Budget (Attachment 3), Letters of Commitment (Attachment 4), Prelimin. Review the full document from California Energy Commission for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Sacramento, California. Review the full solicitation for detailed scope requirements.