Bryan Texas Utilities Tabor to 138kV Interconnection Project RFB No. 001-02-27, 2026
Bryan Texas UtilitiesUtility District · Bryan, TX- Due
- Jan 12, 2027
- 51 days left
- Posted
- Nov 18, 2026
- Primary contact
- Catherine Benavides
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Bryan Texas Utilities is issuing a Request for Bid for the Tabor to 138kV Interconnection Project, RFB No. 001-02-27, in Brazos County, Texas.
The scope of work involves electrical interconnection and utility construction services related to 138kV infrastructure. A mandatory pre-bid meeting and site visit are scheduled for December 15, 2026, starting at 9:30 AM at the BTU System Operations Center located at 2200 Fountain Avenue, Bryan, TX 77801, followed by a site visit at 6590 FM974, Bryan, TX 77808. Electronic or sealed bids must be submitted by January 12, 2027, at 2:00 PM CST via mail order or electronic submission as specified.
REQUIRED ATTACHMENTS
3- ATTACHMENT A - Drawings-Design Package.pdf
- ATTACHMENT B - Bid Units.xlsx
- RFB 001-02-27 Tabor to138kV Interconnection_11.17.26.pdf
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Bryan, TX
Questions about this BID
How do I respond to this Bid from Bryan Texas Utilities?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 12, 2027. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Catherine Benavides.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Bryan Texas Utilities in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Catherine Benavides. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
Where can I find more RFPs from Bryan Texas Utilities?
All active and historical solicitations from Bryan Texas Utilities are tracked and searchable. As a utility district agency, Bryan Texas Utilities regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of January 12, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: ATTACHMENT A - Drawings-Design Package.pdf, ATTACHMENT B - Bid Units.xlsx, RFB 001-02-27 Tabor to138kV Interconnection_11.17.26.pdf. Review the full document from Bryan Texas Utilities for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Bryan, TX. Review the full solicitation for detailed scope requirements.