Bryan Texas Utilities Tabor Road Substation Construction 138kV Line RFB 2026
Bryan Texas UtilitiesUtility District · Bryan, TX- Due
- Jul 2, 2026
- Deadline passed
- Posted
- Jun 4, 2026
- Primary contact
- Catherine Benavides
Hear what Bryan Texas Utilities plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Bryan Texas Utilities is requesting bids for the Tabor Road Substation Construction of Interconnection 138kV Line project located in Bryan, TX, Brazos County.
The scope of work involves electrical substation construction, interconnection, 138kV transmission line work, and related civil and structural improvements. Electronic bids must be submitted by 2:00 PM CST on July 2, 2026. A mandatory pre-bid meeting and site visit is scheduled for June 19, 2026, starting at the BTU System Operations Center.
REQUIRED ATTACHMENTS
6- RFB 029-09-26 Tabor Rd Substation Construction of Interconnection 138kV Yard.pdf
- RFB 029-08-26_TABOR BID UNIT PROPOSAL FORM.xlsx
- RFB 029-08-26_TECHNICAL SPECIFICATIONS.pdf
- BTU Tabor geotech final report Substation Extention_Final_Signed.pdf
- Tabor P&C IFB Drawings_2026.06.03.pdf
- Tabor Physical_Structural IFB Drawings_2026.06.03.pdf
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Bryan, TX
Questions about this BID
How do I respond to this Bid from Bryan Texas Utilities?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is July 2, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Catherine Benavides.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Bryan Texas Utilities in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Catherine Benavides. Questions and answers are typically shared with all prospective bidders.
Show 3 more questions
Where can I find more RFPs from Bryan Texas Utilities?
All active and historical solicitations from Bryan Texas Utilities are tracked and searchable. As a utility district agency, Bryan Texas Utilities regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: RFB 029-09-26 Tabor Rd Substation Construction of Interconnection 138kV Yard.pdf, RFB 029-08-26_TABOR BID UNIT PROPOSAL FORM.xlsx, RFB 029-08-26_TECHNICAL SPECIFICATIONS.pdf, BTU Tabor geotech final r. Review the full document from Bryan Texas Utilities for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Bryan, TX. Review the full solicitation for detailed scope requirements.