Boone County - Gravel Road Paving - 2 - 25-28MAY26 Addendum 1 (2026)
Southern Boone County Fire Protection DistrictFire District · Ashland, MO- Due
- May 28, 2026
- Deadline passed
- Posted
- May 6, 2026
- Duration
- 3 months
- Primary contact
- Brijanna Purdy
- (573) 886-4394
The 30-second brief
Project includes the preparation work to bring the existing gravel roads of N. Boothe Ln., Brennen Dr., Finnegan Ct., Coats Ln., James Sapp Rd., JD Sapp Rd., Franklin Rd., Robbie Forbis Rd., and Willet Rd. to a state in which asphalt paving can occur. Prep work shall include tree removal, removal and replacement of various driveway and cross-road culverts, and the minor placement of aggregate fill. Work also includes aggregate base grading and compaction. Paving shall include the installation of a 3" thick Bit. Base asphalt lift and a 2" thick BP-2 asphalt surface. Additional work includes ditch grading, restoration, and centerline striping.
MOBILIZATION, REMOVALS, ROADSIDE OBSTRUCTIONS, REPLACEMENT INCLUDED, TRAFFIC CONTROL, MATERIAL TESTING, TREE REMOVAL, 15 IN. DIA. CMP, ALUMINIZED, 18 IN. DIA. CMP, ALUMINIZED, 24 IN. DIA. CMP, ALUMINIZED, 36 IN. DIA. CMP, ALUMINIZED, 35x24 IN. CMP PIPE ARCH, ALUMINIZED, 21x15 IN. CMP PIPE ARCH, ALUMINIZED, 42x29 IN. CMP PIPE ARCH, ALUMINIZED, FENCE, REMOVE & REPLACE, MODOT TYPE 3 ROCK DITCH LINER, 9x9 RIP RAP, 12x12 RIP RAP, DITCHING, 1 1/2" MINUS ROAD BASE, BASE PREP-WIDENING, RIPPING, GRADING, & COMPACTION, BITUMINOUS BASE, 3" THICK, TACK COAT, TRACKLESS (OR APPROVED EQUAL), BP-2 SURFACE, 2" THICK, RESIDENTIAL DRIVEWAY TIE-INS, GRAVEL, ROAD TIE-INS, GRAVEL, ROAD EDGE TREATMENT, RESTORATION, CENTERLINE STRIPING, DOUBLE YELLOW
Suitability to purpose, quality, service, previous experience, price, lifecycle cost, ability to deliver
Hear what Southern Boone County Fire Protection District plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Project includes the preparation work to bring the existing gravel roads of N. Boothe Ln., Brennen Dr., Finnegan Ct., Coats Ln., James Sapp Rd., JD Sapp Rd., Franklin Rd., Robbie Forbis Rd., and Willet Rd. to a state in which asphalt paving can occur.
Prep work shall include tree removal, removal and replacement of various driveway and cross-road culverts, and the minor placement of aggregate fill. Work also includes aggregate base grading and compaction. Paving shall include the installation of a 3" thick Bit. Base asphalt lift and a 2" thick BP-2 asphalt surface. Additional work includes ditch grading, restoration, and centerline striping.
EVALUATION CRITERIA
7- Suitability to purpose
- Quality
- Service
- Previous experience
- Price
- Lifecycle cost
- Ability to deliver
REQUIRED DELIVERABLES
46- MOBILIZATION
- REMOVALS
- ROADSIDE OBSTRUCTIONS
- REPLACEMENT INCLUDED
- TRAFFIC CONTROL
- MATERIAL TESTING
- TREE REMOVAL
- 15 IN. DIA. CMP
- ALUMINIZED
- 18 IN. DIA. CMP
- ALUMINIZED
- 24 IN. DIA. CMP
- ALUMINIZED
- 36 IN. DIA. CMP
- ALUMINIZED
- 35x24 IN. CMP PIPE ARCH
- ALUMINIZED
- 21x15 IN. CMP PIPE ARCH
- ALUMINIZED
- 42x29 IN. CMP PIPE ARCH
- ALUMINIZED
- FENCE
- REMOVE & REPLACE
- MODOT TYPE 3 ROCK DITCH LINER
- 9x9 RIP RAP
- 12x12 RIP RAP
- DITCHING
- 1 1/2" MINUS ROAD BASE
- BASE PREP-WIDENING
- RIPPING
- GRADING
- & COMPACTION
- BITUMINOUS BASE
- 3" THICK
- TACK COAT
- TRACKLESS (OR APPROVED EQUAL)
- BP-2 SURFACE
- 2" THICK
- RESIDENTIAL DRIVEWAY TIE-INS
- GRAVEL
- ROAD TIE-INS
- GRAVEL
- ROAD EDGE TREATMENT
- RESTORATION
- CENTERLINE STRIPING
- DOUBLE YELLOW
REQUIRED ATTACHMENTS
8- Bid Response
- Bid Form
- Certification Regarding Debarment
- Work Authorization Certification with proof page of enrollment
- Statement of Bidder's Qualifications
- Anti-Collusion Statement
- Signature and Identity of Bidder
- Addendum 1
- Submit to
- Purchasing Department, 5551 S. Tom Bass Road, Columbia, MO 65201 USA | [email protected]
- Scope location
- Columbia, MO
- Reported agency
- Boone County
Questions about this BID
How do I respond to this Bid from Southern Boone County Fire Protection District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 28, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Purchasing Department, 5551 S. Tom Bass Road, Columbia, MO 65201 USA | [email protected]. For questions, contact Brijanna Purdy.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Southern Boone County Fire Protection District in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Brijanna Purdy at (573) 886-4394. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: MOBILIZATION, REMOVALS, ROADSIDE OBSTRUCTIONS, REPLACEMENT INCLUDED, TRAFFIC CONTROL, MATERIAL TESTING, TREE REMOVAL, 15 IN. DIA. CMP, ALUMINIZED, 18 IN. DIA. CMP, ALUMINIZED, 24 IN. DIA. CMP, ALUMINIZED, 36 IN. DIA. CMP, ALUMINIZED, 35x24 IN. CMP PIPE ARCH, ALUMINIZED, 21x15 IN. CMP PIPE ARCH, ALUM. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Suitability to purpose, quality, service, previous experience, price, lifecycle cost, ability to deliver" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Southern Boone County Fire Protection District?
All active and historical solicitations from Southern Boone County Fire Protection District are tracked and searchable. As a fire district agency, Southern Boone County Fire Protection District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 3 months. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Response, Bid Form, Certification Regarding Debarment, Work Authorization Certification with proof page of enrollment, Statement of Bidder's Qualifications, Anti-Collusion Statement, Signature and. Review the full document from Southern Boone County Fire Protection District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Columbia, MO. Review the full solicitation for detailed scope requirements.