Bell County Water Control and Improvement District No. 1, State Agency, TX·State
Track Unmapped Agency solicitations
Get alerted when Unmapped Agency posts a new RFP, and see the pre-RFP signals months before it publishes.
Bell County Water Control and Improvement District No. 1 seeks bids for Bid Package 9 Raw Water Pump Station Improvements, project 225157-9, located in Bell County, Texas. The work includes demolition of the existing RW-9 pumping unit, installation of CMAR pre-purchased RW-9 and RW-10 vertical turbine pumping units from Smith Pump, and RW-4, RW-9 and RW-10 medium-voltage VFDs from T. Morales / Schneider. Additional scope entails extension of the existing 5 kV Eaton Ampgard MCC with transition sections, new PLC-RW3 control panel, instrumentation, duct bank, raceways, Electrical Building No. 2 modifications including new door openings with structural lintels and CMU infill, and two new 30-ton packaged HVAC units with ductwork and controls, alongside coatings, grating, start-up, testing, and training. Submission deadline is November 10, 2026.
16 bid documents on CivCast (planholder login required)
Common questions about this solicitation, answered from the record.
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 10, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Bell County WCID No. 1 - District Administrative Office, 201 S. 38th Street, Killeen, TX 76543. For questions, contact Paul Skogen.
Based on the posted deadline of November 10, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: 16 bid documents on CivCast (planholder login required). Review the full document from Bell County Water Control and Improvement District No. 1 for the complete list.
Most government agencies, including Bell County Water Control and Improvement District No. 1 in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Paul Skogen at (512) 590-9118. Questions and answers are typically shared with all prospective bidders.
This solicitation defines a specific project scope. The scope covers the following locations: Bell, TX. Review the full solicitation for detailed scope requirements.
Yes. Civic IQ has an MCP server that connects ChatGPT, Claude and other AI assistants to live Civic IQ data: open RFPs, pre-RFP signals from public meetings, awarded contracts and agency decision-makers across 100,000+ US public agencies. Add https://beta.mcp.civiciq.com/mcp as a connector (in ChatGPT under Settings > Apps & Connectors, in Claude under Settings > Connectors) and sign in with a free Civic IQ account at civiciq.com/mcp.
B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.