Alaska Railroad Corporation - ARRC Whittier Timber Trestle Repairs - RFQ 25-77-213928 (2026)
- Due
- Jan 15, 2026
- Deadline passed
- Posted
- Dec 15, 2025
- Contract term
- 1 year
- Primary contact
- Sazil Say
- (907) 265-8747
The 30-second brief
The Alaska Railroad Corporation (ARRC) is soliciting quotes for timber trestle repairs along the Whittier Barge Slip berthing area. The work includes mobilization/demobilization, installation of new timber horizontal and diagonal cross bracing, installation of timber pile clamps, and pile-cap strap connections, along with the removal of scrap materials. Bidders must coordinate work windows with ARRC and Alaska Marine Line (AML) cargo vessel schedules, and ensure personnel meet TWIC card requirements. Quotes are due by January 15th, 2026, at 3:00 PM Local Time. The contract requires prevailing wage compliance, a site safety plan submission, and a 5% bid bond.
Mobilization, Cross Bracing - Horizontal, Diagonal Bracing, Timber Pile Clamp, Tension Strap Connector
Low responsive and responsible bidder
Hear what Alaska Railroad Corporation | State of Alaska plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Alaska Railroad Corporation (ARRC) is soliciting quotes for timber trestle repairs along the Whittier Barge Slip berthing area.
The work includes mobilization/demobilization, installation of new timber horizontal and diagonal cross bracing, installation of timber pile clamps, and pile-cap strap connections, along with the removal of scrap materials. Bidders must coordinate work windows with ARRC and Alaska Marine Line (AML) cargo vessel schedules, and ensure personnel meet TWIC card requirements. Quotes are due by January 15th, 2026, at 3:00 PM Local Time. The contract requires prevailing wage compliance, a site safety plan submission, and a 5% bid bond.
EVALUATION CRITERIA
Low responsive and responsible bidder
REQUIRED DELIVERABLES
5- Mobilization
- Cross Bracing - Horizontal
- Diagonal Bracing
- Timber Pile Clamp
- Tension Strap Connector
REQUIRED ATTACHMENTS
7- Contractor Responsibility Questionnaire
- Construction Bid Form
- Cost Schedule
- Alaska Contractors License
- Planholder Registration Form
- Non-Collusion Affidavit
- Bid Bond
- Submit to
- [email protected]
- Scope location
- Whittier, AK
- Reported agency
- Alaska Railroad Corporation
Questions about this QUOTE
How do I respond to this Quote from Alaska Railroad Corporation | State of Alaska?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 15, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Sazil Say.
Can small businesses or minority-owned firms bid on this Quote?
Most government agencies, including Alaska Railroad Corporation | State of Alaska in AK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Quote submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Sazil Say at (907) 265-8747. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Mobilization, Cross Bracing - Horizontal, Diagonal Bracing, Timber Pile Clamp, Tension Strap Connector. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Low responsive and responsible bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Alaska Railroad Corporation | State of Alaska?
All active and historical solicitations from Alaska Railroad Corporation | State of Alaska are tracked and searchable. As a state agency, Alaska Railroad Corporation | State of Alaska regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this Quote?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Responsibility Questionnaire, Construction Bid Form, Cost Schedule, Alaska Contractors License, Planholder Registration Form, Non-Collusion Affidavit, Bid Bond. Review the full document from Alaska Railroad Corporation | State of Alaska for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Whittier, AK. Review the full solicitation for detailed scope requirements.