Alaska Energy Authority Bradley Lake 3-Phase Power Long Lead Equipment Bid 2026

Alaska Energy Authority | State of Alaska
Due
Sep 11, 2026
Deadline passed
Primary contact
Selwin Ray
(907) 771-3000

The 30-second brief

What they're buying

The Alaska Energy Authority (AEA) is soliciting bids for the purchase and delivery of three-phase long-lead equipment to support the Bradley Lake three-phase power upgrade project. Required long-lead items include conductor, fiber, switchgear, and fiberglass elbows. Submissions are due by September 11, 2026, at 813 W Northern Lights Blvd, Anchorage, AK, 99503. A Notice of Interest is due by 1:00 PM on September 6, 2026. Questions and answers are handled through the owner. The primary contact for this procurement is Selwin Ray at 907-771-3000.

What you must deliver

Conductor, Fiber, Switchgear, Fiberglass elbows

Hear what Alaska Energy Authority | State of Alaska plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The Alaska Energy Authority (AEA) is soliciting bids for the purchase and delivery of three-phase long-lead equipment to support the Bradley Lake three-phase power upgrade project.

Required long-lead items include conductor, fiber, switchgear, and fiberglass elbows. Submissions are due by September 11, 2026, at 813 W Northern Lights Blvd, Anchorage, AK, 99503. A Notice of Interest is due by 1:00 PM on September 6, 2026. Questions and answers are handled through the owner. The primary contact for this procurement is Selwin Ray at 907-771-3000.

REQUIRED DELIVERABLES

4
  • Conductor
  • Fiber
  • Switchgear
  • Fiberglass elbows
Submit to
813 W Northern Lights Blvd, Anchorage, AK, 99503
Scope location
Anchorage, AK
Reported agency
Alaska Energy Authority (AEA)

Questions about this BID

How do I respond to this Bid from Alaska Energy Authority | State of Alaska?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 11, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 813 W Northern Lights Blvd, Anchorage, AK, 99503. For questions, contact Selwin Ray.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Alaska Energy Authority | State of Alaska in AK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Selwin Ray at (907) 771-3000. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: Conductor, Fiber, Switchgear, Fiberglass elbows. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from Alaska Energy Authority | State of Alaska?

All active and historical solicitations from Alaska Energy Authority | State of Alaska are tracked and searchable. As a state agency, Alaska Energy Authority | State of Alaska regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Alaska Energy Authority | State of Alaska for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Anchorage, AK. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

The coverage behind every signal

agencies covered
100,000+agencies covered
buying signals a week
400,000+buying signals a week
decision makers
2.6M+decision makers
in government spend tracked
$14T+in government spend tracked

Trusted by 200+ enterprise teams

Motive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logo

Start finding government buyers today.

Signals from 100,000+ state, local and education agencies, months before the RFP. Free to start.

No credit card required