Alabama Port Authority McDuffie Main 25 kV Switchgear Upgrade - Project 11712 Task 2, 2026

Alabama Port Authority logoAlabama Port Authority
Due
Dec 3, 2026
13 days left
Posted
Nov 1, 2026
Primary contact
Pete Olivero
(251) 622-2688

The 30-second brief

What they're buying

The Alabama Port Authority is soliciting sealed bids for the McDuffie Main 25 kV Switchgear Upgrade project at the McDuffie Coal Terminal in Mobile, AL (Project # 11712, Task # 2). The scope of work comprises procurement, factory assembly, testing, and delivery of a 25 kV outdoor metal-clad/metal-enclosed switchgear lineup in a main-tie-main configuration, featuring two incoming main vacuum circuit breakers, one tie vacuum circuit breaker, eight fused feeder compartments, one spare compartment, and a dedicated low-voltage battery and network communications section. Required equipment includes SEL-351S protective relays, SEL-735 power quality meters, managed industrial Ethernet switches, fiber distribution panels, and a 48 VDC station battery system providing 10-hour full-load reserve. Bids are due by December 3, 2026, at 1:30 PM CST. A certified check or bid bond of 5% of the proposal (not exceeding $10,000), a delivery schedule, and an E-Verify Certificate of Compliance under the Beason-Hammon Act are required with submission. Questions are due by November 25, 2026, at 4:00 PM CST.

What you must deliver

25 kV Main Switchgear lineup, Factory Testing and Delivery, On-site Commissioning Assistance (40 hr.), Spare medium-voltage fuses

How it's scored

Cost, value of proposed solution, delivery schedule

13 days left to submitDue Dec 3

Bids like this start as pre-RFPs. Get the next ones early.

Get matched pre-RFPs free

Free account · 30-second setup · No credit card

Summary

The Alabama Port Authority is soliciting sealed bids for the McDuffie Main 25 kV Switchgear Upgrade project at the McDuffie Coal Terminal in Mobile, AL (Project # 11712, Task # 2).

The scope of work comprises procurement, factory assembly, testing, and delivery of a 25 kV outdoor metal-clad/metal-enclosed switchgear lineup in a main-tie-main configuration, featuring two incoming main vacuum circuit breakers, one tie vacuum circuit breaker, eight fused feeder compartments, one spare compartment, and a dedicated low-voltage battery and network communications section. Required equipment includes SEL-351S protective relays, SEL-735 power quality meters, managed industrial Ethernet switches, fiber distribution panels, and a 48 VDC station battery system providing 10-hour full-load reserve. Bids are due by December 3, 2026, at 1:30 PM CST. A certified check or bid bond of 5% of the proposal (not exceeding $10,000), a delivery schedule, and an E-Verify Certificate of Compliance under the Beason-Hammon Act are required with submission. Questions are due by November 25, 2026, at 4:00 PM CST.

EVALUATION CRITERIA

3
  • Cost
  • Value of proposed solution
  • Delivery schedule

REQUIRED DELIVERABLES

4
  • 25 kV Main Switchgear lineup
  • Factory Testing and Delivery
  • On-site Commissioning Assistance (40 hr.)
  • Spare medium-voltage fuses

REQUIRED ATTACHMENTS

bid bond or certified check, delivery schedule, Certificate of Compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, acknowledgement of addenda

Submit to
Mailing address, shown to Civic IQ members.Sign up free to see it
Scope location
Mobile, AL

Questions about this BID

How do I respond to this Bid from Alabama Port Authority?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 3, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Pete Olivero.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Alabama Port Authority in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Pete Olivero at (251) 622-2688. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: 25 kV Main Switchgear lineup, Factory Testing and Delivery, On-site Commissioning Assistance (40 hr.), Spare medium-voltage fuses. Proposals should clearly address how each deliverable will be met.

Show 5 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Cost, value of proposed solution, delivery schedule" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Alabama Port Authority?

All active and historical solicitations from Alabama Port Authority are tracked and searchable. As a special district agency, Alabama Port Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

Is this solicitation still open for submissions?

Based on the posted deadline of December 3, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: bid bond or certified check, delivery schedule, Certificate of Compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, acknowledgement of addenda. Review the full document from Alabama Port Authority for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Mobile, AL. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

The coverage behind every signal

agencies covered
275,000+agencies covered
buying signals a week
400,000+buying signals a week
decision makers
2.6M+decision makers
in government spend tracked
$14T+in government spend tracked

Trusted by 200+ enterprise teams

Motive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logoMotive logoVeritone logoTerraCycle logoCyvl logoWithersRavenel logoDerivita logoSafeTouch logoIANS Research logoSewerAI logoProdigy Education logoEPR Fireworks logoFlow Labs logoCloudpermit logo

Start finding government buyers today.

Signals from 275,000+ state, local and education agencies, months before the RFP. Free to start.

No credit card required