Alabama Port Authority - McDuffie New East Electrical Building, Task 2 - 2026
- Due
- Nov 3, 2026
- Deadline passed
- Posted
- Oct 1, 2026
- Contract term
- 2 years
- Primary contact
- Brandon Taylor
- (251) 441-7243
The 30-second brief
Construction of an approximately 3,500 square foot electrical building at the Alabama Port Authority's McDuffie Terminal in Mobile, Alabama. The work includes site work, auger cast piling or 16" PCPS concrete piling alternate, concrete foundations, structural masonry, structural steel, roof deck, TPO membrane, mechanical system, and electrical system including 480/277V panelboard "DP", 150kVA transformer "EBXFMR", and 120/208V panelboard "LP". Submission deadline is November 3, 2026 at 1:30 PM. A mandatory pre-bid meeting is scheduled for October 20, 2026, followed by a site visit requiring TWIC card or Port Access Badge and PPE.
3, 500 square foot electrical building, Equipment pad, Underground duct bank, Access ramp, Auger cast piling or 16" SQ X 60' long PCPS concrete piling, Structural block, Bar joist, Roof deck and slab, Roofing insulation, TPO membrane, Mechanical system, Electrical system
Hear what Alabama Port Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Construction of an approximately 3,500 square foot electrical building at the Alabama Port Authority's McDuffie Terminal in Mobile, Alabama.
The work includes site work, auger cast piling or 16" PCPS concrete piling alternate, concrete foundations, structural masonry, structural steel, roof deck, TPO membrane, mechanical system, and electrical system including 480/277V panelboard "DP", 150kVA transformer "EBXFMR", and 120/208V panelboard "LP". Submission deadline is November 3, 2026 at 1:30 PM. A mandatory pre-bid meeting is scheduled for October 20, 2026, followed by a site visit requiring TWIC card or Port Access Badge and PPE.
REQUIRED DELIVERABLES
3, 500 square foot electrical building, Equipment pad, Underground duct bank, Access ramp, Auger cast piling or 16" SQ X 60' long PCPS concrete piling, Structural block, Bar joist, Roof deck and slab, Roofing insulation, TPO membrane, Mechanical system, Electrical system
REQUIRED ATTACHMENTS
Certified check or Bid Bond (5% up to $10,000), Certificate of Compliance with Beason-Hammon Alabama Taxpayer and Citizen Protection Act, State Contractor's License, Non-resident certificate from Secretary of State if applicable
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Duration
- 7 months
- Scope location
- Mobile, AL
Questions about this BID
How do I respond to this Bid from Alabama Port Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 3, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Brandon Taylor.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Alabama Port Authority in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Brandon Taylor at (251) 441-7243. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 3, 500 square foot electrical building, Equipment pad, Underground duct bank, Access ramp, Auger cast piling or 16" SQ X 60' long PCPS concrete piling, Structural block, Bar joist, Roof deck and slab, Roofing insulation, TPO membrane, Mechanical system, Electrical system. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from Alabama Port Authority?
All active and historical solicitations from Alabama Port Authority are tracked and searchable. As a special district agency, Alabama Port Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 2 years. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Certified check or Bid Bond (5% up to $10,000), Certificate of Compliance with Beason-Hammon Alabama Taxpayer and Citizen Protection Act, State Contractor's License, Non-resident certificate from Secr. Review the full document from Alabama Port Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Mobile, AL. Review the full solicitation for detailed scope requirements.