Yakama Nation Toppenish Creek Dam Removals Project - Salmon Habitat Enhancement RFB 2026
- Due
- Dec 21, 2026
- 29 days left
- Posted
- Nov 12, 2026
- Contract term
- 1 year
- Primary contact
- Audrey Cripps
- (509) 790-8596
The 30-second brief
The Confederated Tribes and Bands of the Yakama Nation is requesting bids for a Salmon Habitat Enhancement Project along Toppenish Creek, a tributary of the Yakima River, within the Yakama Reservation. The project involves dam removals, construction of a roughened channel, channel grading and fill placement, dewatering and water management, installation of large wood structures, log placements, riffle material, streambed material, rock/boulder cover features, vegetated wood matrix, and riparian/upland plantings. Work sites include Piggott Dam Site and Royal Dam Site near Toppenish and Harrah, WA. The submission deadline is December 21, 2026, at 4:00 PM PST. A strongly suggested pre-bid site tour will be held on November 19, 2026, at 1:00 PM. Technical questions are due by December 10, 2026, at 3:00 PM. Davis-Bacon wages, TERO requirements, a 3% TERO fee, and a yakama business license apply.
Mobilization, Temporary Access Roads and Staging Areas, Temporary Stream Crossing, Dewatering and Water Management, Furnish Sheet Piles, Furnish All-Thread Rod, Furnish Riffle Material, Furnish Category 1 Rock, Furnish Category 2 Rock, Furnish Streambed Material, Furnish Pit Run Subgrade Material, Remove and Dispose of Existing Structure, Construct Roughened Channel, Channel Grading and Fill Placement, Install Vegetated Wood Matrix, Furnish Willow Cuttings, Install Large Wood Structures, Install Riparian Floodplain Seeding, Install Upland Area Seeding, Install Riparian Floodplain Plantings, Install Upland Area Plantings, Decommission Access Roads, Staging Areas, And Temporary Crossing, Demobilization
Demonstrated experience with this type of work (1-5 pts), Demonstrated quality of work (1-5 pts), Cost (1-6 pts), Schedule (1-5 pts), Company integrity/references (1-3 pts), Demonstrated experience with permitting agencies in the region (1-3 pts), Adequacy/quality of staff and equipment proposed (1-5 pts), Completeness of Proposal (1-3 pts), Tribal Preference (Tribally Owned= 5, Non-Tribally Owned= 0)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Confederated Tribes and Bands of the Yakama Nation is requesting bids for a Salmon Habitat Enhancement Project along Toppenish Creek, a tributary of the Yakima River, within the Yakama Reservation.
The project involves dam removals, construction of a roughened channel, channel grading and fill placement, dewatering and water management, installation of large wood structures, log placements, riffle material, streambed material, rock/boulder cover features, vegetated wood matrix, and riparian/upland plantings. Work sites include Piggott Dam Site and Royal Dam Site near Toppenish and Harrah, WA. The submission deadline is December 21, 2026, at 4:00 PM PST. A strongly suggested pre-bid site tour will be held on November 19, 2026, at 1:00 PM. Technical questions are due by December 10, 2026, at 3:00 PM. Davis-Bacon wages, TERO requirements, a 3% TERO fee, and a yakama business license apply.
EVALUATION CRITERIA
9- Demonstrated experience with this type of work (1-5 pts)
- Demonstrated quality of work (1-5 pts)
- Cost (1-6 pts)
- Schedule (1-5 pts)
- Company integrity/references (1-3 pts)
- Demonstrated experience with permitting agencies in the region (1-3 pts)
- Adequacy/quality of staff and equipment proposed (1-5 pts)
- Completeness of Proposal (1-3 pts)
- Tribal Preference (Tribally Owned= 5, Non-Tribally Owned= 0)
REQUIRED DELIVERABLES
25- Mobilization
- Temporary Access Roads and Staging Areas
- Temporary Stream Crossing
- Dewatering and Water Management
- Furnish Sheet Piles
- Furnish All-Thread Rod
- Furnish Riffle Material
- Furnish Category 1 Rock
- Furnish Category 2 Rock
- Furnish Streambed Material
- Furnish Pit Run Subgrade Material
- Remove and Dispose of Existing Structure
- Construct Roughened Channel
- Channel Grading and Fill Placement
- Install Vegetated Wood Matrix
- Furnish Willow Cuttings
- Install Large Wood Structures
- Install Riparian Floodplain Seeding
- Install Upland Area Seeding
- Install Riparian Floodplain Plantings
- Install Upland Area Plantings
- Decommission Access Roads
- Staging Areas
- Temporary Crossing
- Demobilization
REQUIRED ATTACHMENTS
signed copy of the Toppenish Creek Dam Removals project (Exhibit B), required supporting documentation, insurance certificates
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Duration
- 8 months
- Scope location
- Toppenish, WA
- Reported agency
- Yakama Nation
Questions about this BID
How do I respond to this Bid from Confederated Tribes and Bands of the Yakama Nation?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 21, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Audrey Cripps.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Confederated Tribes and Bands of the Yakama Nation in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Audrey Cripps at (509) 790-8596. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Mobilization, Temporary Access Roads and Staging Areas, Temporary Stream Crossing, Dewatering and Water Management, Furnish Sheet Piles, Furnish All-Thread Rod, Furnish Riffle Material, Furnish Category 1 Rock, Furnish Category 2 Rock, Furnish Streambed Material, Furnish Pit Run Subgrade Material, R. Proposals should clearly address how each deliverable will be met.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Demonstrated experience with this type of work (1-5 pts), Demonstrated quality of work (1-5 pts), Cost (1-6 pts), Schedule (1-5 pts), Company integrity/references (1-3 pts), Demonstrated experience wi..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Confederated Tribes and Bands of the Yakama Nation?
All active and historical solicitations from Confederated Tribes and Bands of the Yakama Nation are tracked and searchable. As a tribal government agency, Confederated Tribes and Bands of the Yakama Nation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 21, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: signed copy of the Toppenish Creek Dam Removals project (Exhibit B), required supporting documentation, insurance certificates. Review the full document from Confederated Tribes and Bands of the Yakama Nation for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Toppenish, WA. Review the full solicitation for detailed scope requirements.