Washington State Department of Transportation - SR 112/E Fork Whiskey Creek - Remove Fish Barriers Project RFQ - XE3719 (2026)
Washington State Department of Transportation | State Ferries Long Range Plan public involvementState · Olympia, WA- Due
- Dec 17, 2026
- 27 days left
- Posted
- Nov 9, 2026
- Contract term
- 7 years
- Primary contact
- Eric Tolman
- (253) 538-3374
The 30-second brief
The Washington State Department of Transportation (WSDOT) is requesting Statements of Qualifications (SOQ) from design-build contractors for the SR 112/E Fork Whiskey Creek – Remove Fish Barriers Project located in Clallam County, Washington (Contract XE3719). The project involves removing 12 existing fish barriers along SR 112 from MP 0.72 to MP 56.50 and replacing them with new structures (bridges and contractor-designed buried structures) and reconstructed stream channels to provide unimpeded fish passage in compliance with a federal court permanent injunction. The estimated contract cost is approximately $180 to $220 million, with Substantial Completion anticipated by March 1, 2033. Key project scopes include civil roadway reconstruction, stream restoration, channel grading, geotechnical engineering, environmental permitting, utility coordination, fish exclusion, stream bypass systems, and maintenance of traffic. Prequalification requires a maximum bidding capacity of $220 million or higher and prequalification for Work Class 6 in the amount of $60 million or higher. The solicitation includes a 9% FSBE goal for design and a 17% FSBE goal for construction, and offers a $725,000 stipend to responsive proposers in the subsequent RFP phase. Submittals are due by December 17, 2026, via the WSDOT SFTP site.
Key Personnel (500 points), Major Participants (500 points), Introduction Letter (Pass/Fail), Legal (Pass/Fail), Financial (Pass/Fail), Forms (Pass/Fail)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Washington State Department of Transportation (WSDOT) is requesting Statements of Qualifications (SOQ) from design-build contractors for the SR 112/E Fork Whiskey Creek – Remove Fish Barriers Project located in Clallam County, Washington (Contract XE3719).
The project involves removing 12 existing fish barriers along SR 112 from MP 0.72 to MP 56.50 and replacing them with new structures (bridges and contractor-designed buried structures) and reconstructed stream channels to provide unimpeded fish passage in compliance with a federal court permanent injunction. The estimated contract cost is approximately $180 to $220 million, with Substantial Completion anticipated by March 1, 2033. Key project scopes include civil roadway reconstruction, stream restoration, channel grading, geotechnical engineering, environmental permitting, utility coordination, fish exclusion, stream bypass systems, and maintenance of traffic. Prequalification requires a maximum bidding capacity of $220 million or higher and prequalification for Work Class 6 in the amount of $60 million or higher. The solicitation includes a 9% FSBE goal for design and a 17% FSBE goal for construction, and offers a $725,000 stipend to responsive proposers in the subsequent RFP phase. Submittals are due by December 17, 2026, via the WSDOT SFTP site.
EVALUATION CRITERIA
REQUIRED ATTACHMENTS
Form A: Acknowledgement of Receipt of Addenda, Form B1: Organizational Conflicts of Interest Certification, Form B2: Organizational Conflicts of Interest Disclosure and Avoidance/Neutralization/Mitigation Plan, Form C: Reference Information for Major Participants, Form D: Design-Builder Certification Wage Law Compliance – Responsibility Criteria
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Duration
- 84 months
- Scope location
- Clallam County, WA
- Reported agency
- Washington State Department of Transportation
Questions about this RFQ
How do I respond to this RFQ from Washington State Department of Transportation | State Ferries Long Range Plan public involvement?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 17, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Eric Tolman.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Washington State Department of Transportation | State Ferries Long Range Plan public involvement in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Eric Tolman at (253) 538-3374. Questions and answers are typically shared with all prospective bidders.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Key Personnel (500 points), Major Participants (500 points), Introduction Letter (Pass/Fail), Legal (Pass/Fail), Financial (Pass/Fail), Forms (Pass/Fail)" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Washington State Department of Transportation | State Ferries Long Range Plan public involvement?
All active and historical solicitations from Washington State Department of Transportation | State Ferries Long Range Plan public involvement are tracked and searchable. As a state agency, Washington State Department of Transportation | State Ferries Long Range Plan public involvement regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 7 years. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 17, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Form A: Acknowledgement of Receipt of Addenda, Form B1: Organizational Conflicts of Interest Certification, Form B2: Organizational Conflicts of Interest Disclosure and Avoidance/Neutralization/Mitiga. Review the full document from Washington State Department of Transportation | State Ferries Long Range Plan public involvement for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Clallam County, WA. Review the full solicitation for detailed scope requirements.