University of New Mexico Hospital CMAR Sterile Processing Dept Renovation RFP-2632-26 - SRMC
- Due
- Jun 9, 2026
- Deadline passed
- Posted
- May 18, 2026
- Primary contact
- Mary Stuart
- (505) 277-8611
The 30-second brief
University of New Mexico Hospital is seeking Construction Manager at Risk (CMAR) services for the Sandoval Regional Medical Center (SRMC) Sterile Processing Department (SPD) Renovation Project under RFP-2632-26. The project involves renovating the sterile processing decontamination room on the 2nd floor to accept new or relocated sterile processing equipment, including four new Steris disinfectors, sonic irrigators, and plumbing upgrades in accordance with NFPA 101 and New Mexico Healthcare Authority building codes. The CMAR delivery method will facilitate early work packages for water treatment requirements, system and equipment water volume measurements, and phased installation while maintaining sterile processing operations. The submission deadline is June 9, 2026. Required qualifications include a contractor's license under the Construction Industries Licensing Act, NMSA 1978 registration, and a minimum bonding capacity for the entire project value.
Past General Contractor Performance (5 Points), Experience in utilization of third party consultant(s), subcontractor(s) and or subject matter experts (5 Points), Presentation of the Project Team (5 Points), Discuss the major challenges (10 Points), Ability of the Respondent (5 Points), Respondent's experience and utilization of subcontractors and material suppliers in New Mexico (5 Points), Recent, current and projected workloads (5 Points)
Hear what University Of New Mexico-Main Campus plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
University of New Mexico Hospital is seeking Construction Manager at Risk (CMAR) services for the Sandoval Regional Medical Center (SRMC) Sterile Processing Department (SPD) Renovation Project under RFP-2632-26.
The project involves renovating the sterile processing decontamination room on the 2nd floor to accept new or relocated sterile processing equipment, including four new Steris disinfectors, sonic irrigators, and plumbing upgrades in accordance with NFPA 101 and New Mexico Healthcare Authority building codes. The CMAR delivery method will facilitate early work packages for water treatment requirements, system and equipment water volume measurements, and phased installation while maintaining sterile processing operations. The submission deadline is June 9, 2026. Required qualifications include a contractor's license under the Construction Industries Licensing Act, NMSA 1978 registration, and a minimum bonding capacity for the entire project value.
EVALUATION CRITERIA
Past General Contractor Performance (5 Points), Experience in utilization of third party consultant(s), subcontractor(s) and or subject matter experts (5 Points), Presentation of the Project Team (5 Points), Discuss the major challenges (10 Points), Ability of the Respondent (5 Points), Respondent's experience and utilization of subcontractors and material suppliers in New Mexico (5 Points), Recent, current and projected workloads (5 Points)
REQUIRED ATTACHMENTS
12- Conflict of Interest Form
- Proposer Qualifications for General Contractor
- Resident Preference Number certification form
- Resident Veterans Certification
- Organization form
- Licensing form
- Surety form
- Safety form
- Company Safety Plan
- Insurance and claims history form
- Quality assurance form
- Labor code violations form
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Sandoval County, NM
- Reported agency
- University of New Mexico
Questions about this RFP
How do I respond to this RFP from University Of New Mexico-Main Campus?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 9, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Mary Stuart.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including University Of New Mexico-Main Campus in NM, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Mary Stuart at (505) 277-8611. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Past General Contractor Performance (5 Points), Experience in utilization of third party consultant(s), subcontractor(s) and or subject matter experts (5 Points), Presentation of the Project Team (5 P..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from University Of New Mexico-Main Campus?
All active and historical solicitations from University Of New Mexico-Main Campus are tracked and searchable. As a higher ed agency, University Of New Mexico-Main Campus regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Conflict of Interest Form, Proposer Qualifications for General Contractor, Resident Preference Number certification form, Resident Veterans Certification, organization form, licensing form, surety for. Review the full document from University Of New Mexico-Main Campus for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Sandoval County, NM. Review the full solicitation for detailed scope requirements.