Town of Cary - Swift Creek Pump Station PLC Improvements - RFP #354-UT27-17 (2026)
- Due
- Nov 9, 2026
- Deadline passed
- Posted
- Oct 15, 2026
- Contract term
- 1 year
- Primary contact
- Yang Song
The 30-second brief
The Town of Cary is seeking proposals from qualified control system integrators to design, furnish, program, install, test, and commission improvements to the supervisory and control system at the Swift Creek Pump Station. The work includes PLC hardware and programming, HMI configuration, control panel fabrication (UL 508A), VFD integration, field instrumentation, Site Acceptance Tests (SAT), startup, commissioning, training, as-built documentation, and software source files. The facility is located at 7802 Holly Springs Rd, Cary NC 27518. Proposals are due by November 5, 2026 at 10:00 a.m. ET, and must be submitted electronically through the North Carolina Electronic Vendor Portal (eVP). An optional pre-proposal conference/site visit is scheduled for October 22, 2026 at 2:00 p.m. ET at the site, and written questions are due by October 26, 2026 at 5:00 p.m. ET.
PLC hardware and programming; HMI configuration; Control panel fabrication (UL 508A); VFD integration as specified; Field instrumentation as specified; Site Acceptance Test (SAT); Startup and commissioning; Training; As-built documentation; Software source files delivered to Owner
Corporate Background and Experience (15), Project understanding and approach (35), Team Organization, References (Past Experience) (20), Cost Proposal (30)
Hear what Cary plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Town of Cary is seeking proposals from qualified control system integrators to design, furnish, program, install, test, and commission improvements to the supervisory and control system at the Swift Creek Pump Station.
The work includes PLC hardware and programming, HMI configuration, control panel fabrication (UL 508A), VFD integration, field instrumentation, Site Acceptance Tests (SAT), startup, commissioning, training, as-built documentation, and software source files. The facility is located at 7802 Holly Springs Rd, Cary NC 27518. Proposals are due by November 5, 2026 at 10:00 a.m. ET, and must be submitted electronically through the North Carolina Electronic Vendor Portal (eVP). An optional pre-proposal conference/site visit is scheduled for October 22, 2026 at 2:00 p.m. ET at the site, and written questions are due by October 26, 2026 at 5:00 p.m. ET.
EVALUATION CRITERIA
REQUIRED DELIVERABLES
10- PLC hardware and programming
- HMI configuration
- Control panel fabrication (UL 508A)
- VFD integration as specified
- Field instrumentation as specified
- Site Acceptance Test (SAT)
- Startup and commissioning
- Training
- As-built documentation
- Software source files delivered to Owner
REQUIRED ATTACHMENTS
6- Cover Letter/Letter of Intent
- Corporate Background and Experience
- Project Understanding, Approach and Schedule
- Team Organization, Experience and Certifications/Qualifications
- Cost Proposal (Page with Pricing)
- References
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Duration
- 36 months
- Scope location
- Cary, NC
Questions about this RFP
How do I respond to this RFP from Town of Cary?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 9, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Yang Song.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Town of Cary in NC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Yang Song. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: PLC hardware and programming; HMI configuration; Control panel fabrication (UL 508A); VFD integration as specified; Field instrumentation as specified; Site Acceptance Test (SAT); Startup and commissioning; Training; As-built documentation; Software source files delivered to Owner. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Corporate Background and Experience (15), Project understanding and approach (35), Team Organization, References (Past Experience) (20), Cost Proposal (30)" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Town of Cary?
All active and historical solicitations from Town of Cary are tracked and searchable. As a city agency, Town of Cary regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Cover Letter/Letter of Intent; Corporate Background and Experience; Project Understanding, Approach and Schedule; Team Organization, Experience and Certifications/Qualifications; Cost Proposal (Page w. Review the full document from Town of Cary for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Cary, NC. Review the full solicitation for detailed scope requirements.